About UPERC

Keeping the restructuring of the power sector in mind, the government of Uttar Pradesh has enacted the U. P. Electricity Reform Act 1999 and has set up the U. P. Electricity Regulatory Commission (UPERC), as an autonomous body corporate. It consists of three members, one of whom is nominated as the Chairman of the Commission. With its headquarters in Lucknow, the Commission is entitled to conduct its proceedings, consultations and hearings in other places in the state also. The Commission has the exclusive power to make regulations for the conduct of its proceedings and discharge of its functions. The Commission is vested with the same powers as that of a Civil Court under the Code of Civil Procedure 1908 (Central Act 5 of 1908) for obtaining information and evidence. Objective of the Commission is that electricity will be supplied under the most efficient conditions in terms of cost and quality to support the economic development of the state of Uttar Pradesh. Power sector would cease to be a burden to the state's budget and would eventually become a net generator of financial resources. Protection of Interest of Consumers.

UPERC Snapshot of power sector
Installed Capacity (As on 31-Jun-2026)
State Ownership Technology wise breakup (MW) Grand Total
Thermal Nuclear Renewable
Coal Lignite Gas Diesel Total Hydro RES(MNRE)
Uttar Pradesh
Generating units (As on 29-02-2024)
Sr. No. Utility Ownership Type Energy Source Installed Capacity (MW)
1 UPJVNL State HYDRO-HYDRO 72.00
2 UPJVNL State HYDRO-HYDRO 30.60
3 UPJVNL State HYDRO-HYDRO 99.00
4 UPJVNL State HYDRO-HYDRO 300.00
5 UPJVNL State HYDRO-HYDRO 13.70
6 UPJVNL State HYDRO-HYDRO 3.00
7 UPJVNL State HYDRO-HYDRO 3.00
8 UPJVNL State HYDRO-HYDRO 3.60
9 UPRVUNL State THERMAL-COAL 630.00
10 UPRVUNL State THERMAL-COAL 1000.00
11 UPRVUNL State THERMAL-COAL 1000.00
12 UPRVUNL State THERMAL-COAL 105.00
13 UPRVUNL State THERMAL-COAL 500.00
14 UPRVUNL State THERMAL-COAL 660.00
15 UPRVUNL State THERMAL-COAL 1000.00
16 UPRVUNL State THERMAL-COAL 420.00
17 UPRVUNL State THERMAL-COAL 500.00
18 BAJAJ ENERGY PVT. LTD. Private THERMAL-COAL 90.00
19 BAJAJ ENERGY PVT. LTD. Private THERMAL-COAL 90.00
20 BAJAJ ENERGY PVT. LTD. Private THERMAL-COAL 90.00
21 BAJAJ ENERGY PVT. LTD. Private THERMAL-COAL 90.00
22 BAJAJ ENERGY PVT. LTD. Private THERMAL-COAL 90.00
23 TATA POWER COM. LTD. Private THERMAL-COAL 1980.00
24 MEJA URJA NIGAM PVT. LTD. Private THERMAL-COAL 1320.00
25 LANCO anpara Private THERMAL-COAL 1200.00
26 LALITPUR PGCL Private THERMAL-COAL 1980.00
27 NTPC LTD. Center THERMAL-GAS 663.36
28 NTPC LTD. Center THERMAL-COAL 840
29 NTPC LTD. Center THERMAL-COAL 980
30 NTPC LTD. Center THERMAL-GAS 830
31 NTPC LTD. Center THERMAL-COAL 1000
32 NTPC LTD. Center THERMAL-COAL 1000
33 NTPC LTD. Center THERMAL-COAL 1000
34 NTPC LTD. Center THERMAL-COAL 2000
35 NTPC LTD. Center THERMAL-COAL 440
36 NTPC LTD. Center THERMAL-COAL 1320
37 NTPC LTD. Center THERMAL-COAL 420
38 NTPC LTD. Center THERMAL-COAL 420
39 NTPC LTD. Center THERMAL-COAL 210
40 NTPC LTD. Center THERMAL-COAL 500
41 NPCIL Center NUCLEAR- NUCLEAR 440
42 THDC Center HYDRO-HYDRO 24

Link- https://cea.nic.in/wp-content/uploads/executive/2023/09/R1_Executive_Summary_September_2023.pdf

Energy Sales (MUs) in FY 24
Sr. No. Consumer Category DVVNL MVVNL PVVNL PuVVNL KESCO NPCL
1 LMV-1 Domestic 9558 13297 13923 15883 1899 981
2 LMV-2 Non Domestic 1520 2039 2181 2459 413 59
3 LMV-3 Public lamps 117 337 190 146 35 38
4 LMV-4 Light, fan & power for public / private institution 333 331 233 379 78 19
5 LMV-5 Private tube well / pumping sets 4869 3049 7849 3516 0.1 20
6 LMV-6 Small & medium power upto 100 HP/ 75 kW 802 566 1467 670 388 131
7 LMV- 7 Public water works 1275 1397 919 1780 122 30
LMV- 8 State tube wells & pumps canal upto 100 HP 34
8 LMV- 9 Temporary Supply 50 148 16 10 55
9 LMV- 10 Departmental employees 180 165 134 124 43
10 LMV- 11 Electric Vehicles 5 6 1 7 1
HV- 1 Non industrial bulk load 525 1006 1965 641 245 436
11 HV- 2 Large & heavy power above 100 BHP (75 kW) 3376 1969 6579 1612 938 1546
HV- 3 Railway traction - 38 83 6
HV-4 Lift irrigation & p. canal above 100 BHP (75 kW) 109 81 1 531
Extra state consumers 20 4
Total 22718 24335 35672 27768 4177 3316

Link- https://www.uperc.org/App_File/TariffOrderStateDiscomsDigitallySigned-pdf525202322444AM.pdf

Breakup of RE (MW) (As on 31.03.2024)
States / UTs Small Hydro Wind BM Cogen. (Bagasse) BM Cogen. (Non- Bagasse) Waste to Energy Waste to Energy (Off-grid) Ground-Mounted Solar Rooftop Solar Hybrid Solar Off-grid Solar Total Capacity
Uttar Pradesh 49.1 1957.5 165.26 103.38 2435.00 265.10 0 219.77 5697

Link- https://cdnbbsr.s3waas.gov.in/s3716e1b8c6cd17b771da77391355749f3/uploads/2023/11/202311081719950808.pdf

Average Cost of Supply (ACoS) (Rs./ kWh)
Sr. No. DISCOMs FY 24
1 DVVNL 7.46
2 MVVNL 7.46
3 PVVNL 7.46
4 PuVVNL 7.46
5 KESCO 7.46
6 NPCL 7.14

Link- https://www.uperc.org/App_File/TariffOrderStateDiscomsDigitallySigned-pdf525202322444AM.pdf

Latest Documents
S. No. Title Date
1 UPERC( (MYT for Transmission) (First Amendment) Regulations, 2025. 13-01-2026
2 UPERC (Captive and Renewable Energy Generating Plants) Regulations, 2024 17-10-2025
3 UPERC (Captive and Renewable Energy Generating Plants) (SOR) Regulations, 2024 17-10-2025
4 UPERC (Fees & Charges of State Load Despatch Centre and other related matters) Regulations, 2025 06-06-2025
5 UPERC (Multi Year Tariff for Transmission) Regulation, 2025 06-06-2025
6 UPERC (Multi Year Tariff for Transmission) (SOR) Regulation, 2025 06-06-2025
7 (Multi Year Tariff for Transmission) Regulations, 2025. 06-06-2025
8 UPERC (Rooftop Solar PV Grid Interactive System Gross/ Net Metering) (Third Amendment) Regulation, 2019 03-06-2025
9 UPERC (Captive and Renewable Energy Generating Plants) Regulations, 2024 [Draft] 07-05-2025
10 UPERC (Terms and Conditions of Generation Tariff) Regulations, 2024 09-04-202509-04-2025
11 UPERC (Terms and Conditions of Generation Tariff) (SOR) Regulations, 2024 09-04-2025
12 UPERC (MULTI YEAR TARIFF FOR DISTRIBUTION) REGULATIONS, 2025 26-03-2025
13 UPERC  (MYT for Distribution and Transmission Tariff) (Third Amendment) Regulations, 2025 08-01-2025
14 UPERC (Terms and Conditions for Open Access) (First Amendment) Regulations, 2024 16-12-2024
15 The Uttar Pradesh Electricity Regulatory Commission (MYT for Distribution and Transmission Tariff) (Third Amendment) Regulations, 2024 [Draft] 02-09-2024
16 UPERC (Terms andConditions for Open Access) (First Amendment) Regulations, 2024 [Draft] 29-07-2024
17 UPERC (Regulations for Resource Adequacy Framework Regulations), 2024 [Draft] 03-07-2024
18 UPERC (Grant of Connectivity to intra-State Transmission System) (First Amendment) Regulations, 2024 07-02-2024
19 UPERC (Appointment of Consultants) Regulations, 2023 29-11-2023
20 UPERC (Rooftop Solar PV Grid Interactive System Gross/ Net Metering) Regulation, 2019 (Second Amendment) 17-11-2023
21 UPERC (Green Energy Open access) (1st Amendment) (MoP-Principle), 2023 18-07-2023
22 UPERC (Power System Development Fund) Regulations, 2023 20-06-2023
23 UPERC (Power System Development Fund) Regulations, 2023 [Draft] 24-04-2023
24 UPERC (Modalities of Tariff Determination) Regulations, 2023 28-02-2023
25 UPERC (Verification of Generating Plants and Captive Consumers) Regulation, 2022 26-12-2022
26 UPERC (Facilitation of Telecommunication Network) Regulation, 2022 26-12-2022
27 UPERC (Modalities of Tariff Determination)Regulations, 2022 21-12-2022
28 UPERC (Modalities of Tariff Determination) Regulation, 2022 21-12-2022
29 UPERC (Facilitation of Telecommunication Network) Regulations, 2022. 17-11-2022
30 UPERC (Terms and Conditions of Generation Tariff) (1st Amd) Regulations, 2022 31-08-2022
31 UPERC (Consumer Grievance Redressal Forum) Regulations, 2022 31-08-2022
32 UPERC (Rooftop Solar PV Grid Interactive System Gross/Net Metering) Regulations, 2019 31-08-2022
33 UPERC (Rooftop Solar PV Grid Interactive System Gross/Net Metering) (1st Amd) Regulations, 2019 31-08-2022
34 UPERC (Terms and Conditions of Generation Tariff) (1st Amd) Regulations, 2022 31-08-2022
35 UPERC (Multi Year Tariff for Distribution and Transmission) (2nd Amd) Regulations, 2022 04-01-2022
36 UPERC (Multi Year Tariff for Distribution and Transmission) (Second Amendment) [Draft]Regulations, 2021. 09-11-2021
37 UPER (Merit Order Despatch and Optimization of Power Purchase) Regulations, 2021 03-02-2021
38 UPER (Merit Order Despatch and Optimization of Power Purchase) Regulations, (SOR) 2021 03-02-2021
39 UPERC (Consumer Grievance Redressal Forum & Electricity Ombudsman) (2nd Amd) Regulations, 2020 26-08-2020
40 UPERC (Cost data Book for Recovery of Expenses & other Charges from Prospective Consumers for taking Electric Supply) 2016 26-08-2020
41 UPERC (Electricity Grid Code) Regulations, 2007 26-08-2020
42 UPERC (Multi Year Tariff for Distribution and Transmission) (1st Amd) Regulations, 2019 05-06-2020
43 UPERC (Procedure, Terms & Conditions for payment of Fees & charges to SLDC and other related provisions) Regulations, 2020 14-05-2020
44 UPERC (Fees & Charges of State Load Despatch Centre and other related matters) Regulation, 2020 14-05-2020
45 UPERC (Procedure for Forecasting, Scheduling, Deviation Settlement and Related Matters) Regulations, 2020 18-03-2020
46 UPERC (Captive and Renewable Energy Generating Plants) (1st Amd) Regulations, 2019 22-01-2020
47 UPERC (Standard of Performance) Regulations, 2019 16-12-2019
48 UPERC (Standards of Performance) Regulations, 2019 16-12-2019
49 UPERC (Terms and Conditions for Open Access) Regulations, 2019 10-12-2019
50 UPERC (Terms and Conditions for Open Access) Regulations, (SOR) (1st Draft) 2019 26-09-2019
Latest Documents
S. No. Title Date
1  UPERC (UPPCL - Approval for tender documents including the request for Qualification, Request for Proposal and Draft PPA to be floated by UPPCL for Procurement of 1000 MW of source Agnostic Peak Power for medium Term.) 09-07-2026
2  UPERC (Alaknanda Hydro Power Company Limited. -Determination of Tariff for the 330 MW(4 x 82.5 MW) Shrinagar Hydro electric Project for the Control Period FY 2024-25 to FY 2028-2029.) 07-07-2026
3 UPERC (Dhariwal Infrastructure Ltd. -Approval of ARR and Multi Year Generation Tariff for the period of FY 2024-25 to FY 2028-29 for supply of 187 Gross Contracted Capacity to NPCL .) 06-07-2026
4 UPERC (suomoto proceeding on Implication of decrease in GST rate on procurement of renewable energy devices and parts for their manufacture from 12% to 5% and its impact on the PPAs executed under Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM) Component- C2 Scheme.) 23-06-2026
5  UPERC (suomoto proceeding on Computation and levy of Fuel and Power Purchase Adjustment Surchage (FPPAS) for the month of June, 2026.) 23-06-2026
6 UPERC (Approval of PPA executed between Project Developers and UPPCL and UPNEDA for adoption of tariff discovered through RfS invited for procurement of power through tariff based competitive bidding process from grid connected solar plants connected to selected segregated agriculture feeder of distribution substation with cumulative capacity of 2553.5 MW for sale of power to UPPCL vide the PPA through RESCO mode under feeder level solarization of PM KUSUM Component C-2 Scheme.) 18-06-2026
7 UPERC (Tirwa Transmission Limited - Seeking appropriate reliefs with regard extension of scheduled commissioning date and stay off any coercive measures.) 18-06-2026
8 UPERC (the matter of APTEL Appeal No. 98 OF 2021, IA No. 2004 OF 2024, APPEAL No. 465 OF 2023, APPEAL No. 343 OF 2021, APPEAL No. 398 OF 2022, APPEAL No. 676 OF 2023, APPEAL No. 58 OF 2025 AND APPEAL No. 153 OF 2026.) 17-06-2026
9 UPERC (Seeking approval of Amended Power Purchase Agreement dated 12.02.2026 for extension of the term of Power Purchase Agreement(PPA) dated 16.12.2006 and Amended Power Purchase Agreement(APPA) dated 23.08.2018 for supply of 17 MW of Power from the Respondent’s 28 MW Bagasse based power plant situated at Titawi, District Muzaffarnagar) 16-06-2026
10  UPERC (Seeking approval of Amended PPA Dated 26.02.2026 for extension of term of PPA dat 26.09.2006 for sale of 5 MW Power from 15 MW baggase based co-genration Plant Babhnan.) 16-06-2026
11 UPERC (Amplus Green Power Pvt. Ltd, Amplus RJ Solar Pvt. Ltd. & Amplus solar Shakti Pvt Ltd. V/s UPPCL , UPPTCL & UPSLDC. Seeking Effective implementation of banking framework applicable to existing captive generating plants.) 16-06-2026
12  UPERC (Seeking of approval for procurement of power by UPPCL from the 20 MW floating solar plant proposed to be established by Coal India Limited on cost plus basis at Chilwa Tal, Gorakhpur, Uttar Pradesh and seeking necessary relaxations under Regulation 6 (ii) of the UPERC (Captive and Renewable Energy Generating Plants) Regulations, 2024 and Regulation 4 read with Regulation 9 of UPERC (Modalities of Tariff Determination) Regulation, 2023.) 16-06-2026
13 UPERC (Seeking approval of Procurement of 240 MW Power from Subansirl Lower HE Project 2000 MW (8 X250 mw) Arunachal Pradesh As well as approval of PPA dated 16.10.2025 Entered into between NHPC Ltd and UPPCL.) 09-06-2026
14 UPERC (Approval of the Hon’ble Commission for disbursal of funds from the PSDF account for the procurement of Remote Terminal Unit for the data transmission of SAS and Non-SAS based 132 KV voltage level sub-stations of UPPTCL for the purpose of SCADA DATA grid control and better load management, protection and control infrastructures.) 09-06-2026
15 UPERC (SAEL Solar P6 Private Limited. V/s UPPCL & UPPTCL. Seeking exemption from payment of transmission, wheeling and banking charges and exemption from time of day restriction for utilisation of banked power for the power generated from the proposed captive generation project intended to supply power to petitioner’s integrated photovoltaic (PV) cell fabrication and module manufacturing facility which is to be established in the state of Uttar Pradesh under Atmanirbhar policy 2020.) 09-06-2026
16 UPERC (Chandan Singh, Rohit Singh V-s UPPTCL & Ors. Revision Under Sub-rule 3 of Rule 3 of Works of Licensees Rules, 2006.) 09-06-2026
17 UPERC ( UPPCL - Seeking clarificatory intervention and removal of regulatory vacuum pending formal amendment for the provision of tariff for power procured from categories of Renewable energy-based generation plants not provided for in the aforementioned regulations, i.e., Other Renewable energy Generation Plants.) 09-06-2026
18  UPERC (Lalitpur Power Genration Co. - Petition U/s 61(a), 61(h), 62,64read with 86(1)(e) & (f) of the EA 2003 in compliance of this Hon’ble Commission Order dated 26.09.2023 in petition No. 1898 of 2022 and allow co-firing of Biomass pellets in the power station of LPGCL and recovered recovery of its costs in variable charges/ECR.) 05-06-2026
19 UPERC (2365 of 2026 - India Glycols Limited - Seeking determination/clarification of the applicable tariff for the Petitioner’s Non-RE Captive Co-Generation Plant commissioned during FY 2013–2014 in terms of the Power Purchase Agreement (PPA) dated 23.07.2012) 04-06-2026
20 UPERC (Seeking reimbursement of Excess Energy Charges paid to PPGCL along with carrying costs.) 04-06-2026
21  UPERC (Approval for implementation of 06 nos. Transmission scheme of which 02 nos. in Deposit, 02 nos. in RTM and 02 nos. in TBCB considered in TWC of 1 st Quarter in FY 2025-26 with an estimated cost of Rs. 396.79 crore of which Rs. 74.87 Crore in RTM mode in terms of Regulation 27.3 of Uttar Pradesh Electricity Regulatory Commission (Multi-Year Tariff for Transmission) Regulations, 2025.") 04-06-2026
22  UPERC (Shri Shaurya Power Tech and ors vs UPPCL and ors - Seeking extension of COD of 12 months from 31 March 2017 as per order dt 5 April 2016 in petition number 1019 of 2015 1024 of 2015 and 1087 of 2016 and restoration of Bank Guarantee .) 04-06-2026
23 UPERC ( Seeking issuance of directions to respondents to permit repowering/replacement of degraded solar PV modules for the petitioner’s 1 MW Solar Power Project, further, the petition is also being filed seeking a declaration that denial of consent for repowering/replacement of decfective/demaged modules of the project vide letter dated 09.10.2025 issued by respondent no. 1, is unlawful, in view of the provision of PPA ad applicable regulation and MNRE guidelines for repowering of solar modules, consequently, the petition is also seeking compensation toward generation losses incurred by the petitioner for the period from 16.12.2024 till 15.12.2025 amounting to Rs. 1.438 Crores.) 04-06-2026
24 UPERC (UPPCL - Approval of PPA dated 16.07.2025 and adoption of tariff discovered through request for selection invited for procurement of power through tariff based bidding process to procure 300 MW of solar power for a period of 25 years.) 04-06-2026
25 UPERC (UPPCL - seeking the approval for the long-term joint procurement of 1130 MWh energy through competitive bidding for Battery Energy Storage System by Uttar Pradesh Power Corporation Limited and Madhya Pradesh Power Management Corporation Limited for a period of 15 years.) 02-06-2026
26 UPERC (B & G Renewable Energy Pvt. Ltd. vs UPPCL and ors . - Seeking extension of the Commercial Operation Date under the PPA as claimed in the prayer of the petition.) 02-06-2026
27 UPERC (B & G Renewable Energy vs UPPCL and ors - Seeking additional tariff on account of Change in Law events and quantification of tariff escalation on account of increase in capital cost as claimed in the prayer of its petition.) 02-06-2026
28  UPERC (Lanco Anpara Power Limited - Petition for reimbursement of expenditure incurred towards transportation of fly ash during FY 2022-23 and FY 2023-24 according the Notification No. S.O. 5481€ dated 31.12.2021 issued by Ministry of Environment , forest & Climate Change, GoI.) 02-06-2026
29 UPERC (SEUPPTCL - Seeking extension of Scheduled Commercial Operation date and other consequential reliefs.) 02-06-2026
30  UPERC (NPCL- Seeking approval of Hon’ble Commission for procurement of power from 4 x20 MW/320 MWh Standalone Battery Energy Storage System (BESS) project to be set up o multiple locations in Greater Noida, UP through Tariff based competitive Bidding for a period of 12 years) 26-05-2026
31 UPERC (Naresh Kumar Yadav, Pankaj Yadav - Revision Petition against order passed by DM Lucknow.) 26-05-2026
32  UPERC (UPNEDA UPPCL. vs Essel Infraprojects and ors - Petition No. 1110 of 2016 - In the matter of appeal number 37 of 2018, 88 of 2018, 102 of 2018, 129 of 2018, 302 of 2018 in APTEL.) 26-05-2026
33 UPERC (Amplus Green Power Pvt. Ltd, Amplus RJ Solar Pvt. Ltd. & Amplus solar Shakti Pvt Ltd. Seeking Effective implementation of banking framework applicable to existing captive generating plants.) 25-05-2026
34  UPERC (KBGB Agritech Pvt. Ltd. - Seeking Direction to the respondent to allow the petitioner to supply power from its Unit-2 to Unit-1 ) 25-05-2026
35 UPERC ( Sanjay Kumar Pandhi - Representation filed as regular petition before Hon’ble Commission under the applicable provision and regulations mentioned herein, in pursuance of the liberty granted by the Hon’ble High Court, Lucknow bench in Writ – C 9170 of 2025 Vide order dated 19.09.2025.) 25-05-2026
36 UPERC  (UPPCL - Seeking relaxation in complying with directions issued in the orders passed by this Commission in 59SM, 60SM and 61 SM of 2022.) 22-05-2026
37 UPERC (Seeking Payment of Transmission Charges along with Late Payment Surcharge.) 22-05-2026
38  UPERC (Ramesh Chandra - Revision Under Sub rule 3 of Rule 3 of Works of Licensees Rules, 2006. in Petition no 2358 of 2026) 22-05-2026
39 UPERC (Seeking an exemption from the mandatory implementation of multi-point electricity connections as prescribed under the Uttar Pradesh Electricity Supply Code (Thirteenth Amendment), 2018 in the multi-storey buildings developed by the private builders. The Petitioner further prays for the issuance of appropriate directions permitting to grant a separate single-point electricity connection for its group housing project on the Footprint No. B-11, situated at Sector 19 and 25 Jaypee Greens, Greater Noida, District Gautam Buddh Nagar, Uttar Pradesh in the name of the Petitioner.) 22-05-2026
40 UPERC (Seeking an exemption from the mandatory implementation of multi-point electricity connections as prescribed under the Uttar Pradesh Electricity Supply Code (Thirteenth Amendment), 2018 in the multi-storey buildings developed by the private builders. The Petitioner further prays for the issuance of appropriate directions permitting to grant a separate single-point electricity connection for its group housing project on the Footprint No. B-10, situated at Sector 19 and 25 Jaypee Greens, Greater Noida, District Gautam Buddh Nagar, Uttar Pradesh in the name of the Petitioner.) 22-05-2026
41 UPERC ( Jaypee Infratech Limited vs PVVNL and ors - Seeking direction in respect of the status of the Project in term of the 13th Amendment for waiver of the requirement of conversion of existing single point connection to multi point connection in the multi story building developed by private builders along with enhancement of existing 19.8 MVA/33 kV single point connection to 35 MVA/132 kV supply at GSS-01, Sector 128 Noida in Jaypee wish Town, Noida s well as directions for approval of connection the name of Jaypee Infratech Ltd. of 9.7 MVA/ss kV supply at GSS-02sector 134 Noida . 22-05-2026
42 UPERC (Jubilant Pharmova Limited.- Seeking exemption under clause 4.46(a) of the Electricity Supply Code, 2005 for supplying energy supplied to the Petitioner by Respondent and/or by licensed electricity (including renewable energy) producer/trader, to its wholly owned subsidiary – Jubilant Biosys Limited and group companies- Jubiulant Ingrevia Limited and Jubliant Agri and Consumer products Limited, situated on the same premises.) 22-05-2026
43 UPERC (MecLEC Technical Project Laboratory Pvt. Ltd. - Seeking determination of project specific tariff for procurement of power from 1 MW (10 x 100 KW) Surface Hydrokinetic Turbine (SHKT) Pilot Project proposed on the Cooling Water Discharge Channel of Anapra Thermal Power Station (Units A & B).) 22-05-2026
44 UPERC (Corrigendum order dated 20/05/26 for 967/2025,968 of 2025 and 1016 of 2025 - Rosa Power Supply Company Ltd. 20-05-2026
45 UPERC (NPCL- Seeking approval of this Hon’ble Commission for long term procurement of power from 300 MW Wind-Solar Hybrid Power Project through Tariff Based Competitive Bidding process and seeking approval of deviation from the aforesaid Guidelines for Tariff Based Competitive Bidding Process for procurement of Power from Grid Connected Wind Solar Hybrid projects dated 21.08.2023.) 19-05-2026
46  UPERC (UPPCL, UPNEDA - Approval of Power Purchase Agreements (PPA) executed between Project Developers and Uttar Pradesh Power Corporation Limited and UPNEDA for adoption of tariff discovered through Request for Selection invited for procurement of power through tariff based competitive bidding process from grid connected solar plants connected to selected segregated agriculture feeder of distribution substation with cumulative capacity of 2553.5 MW for sale of power to Uttar Pradesh Power Corporation Limited vide the PPA through RESCO mode under feeder level solarization of Pradhan Mantri Kisan Urja Suraksha Evam Utthan Mahabhiyan Scheme (PM KUSUM) Component C-2 Scheme.) 19-05-2026
47 UPERC (UPPCL, UPNEDA - Approval of Power Purchase Agreements (PPA) executed between Project Developers and Uttar Pradesh Power Corporation Limited and UPNEDA for adoption of tariff discovered through Request for Selection invited for procurement of power through tariff based competitive bidding process from grid connected solar plants connected to selected segregated agriculture feeder of distribution substation with cumulative capacity of 2553.5 MW for sale of power to Uttar Pradesh Power Corporation Limited vide the PPA through RESCO mode under feeder level solarization of Pradhan Mantri Kisan Urja Suraksha Evam Utthan Mahabhiyan Scheme (PM KUSUM) Component C-2 Scheme.) 19-05-2026
48 UPERC (UPNEDA, UPPCL- Approval of Power Purchase Agreements executed between Project Developers and Uttar Pradesh Power Corporation Limited and UPNEDA for adoption of tariff discovered through Request for Selection invited for procurement of power through tariff based competitive bidding process from grid connected solar plants connected to selected segregated agriculture feeder of distribution substation with cumulative capacity of 2553.5 MW for sale of power to Uttar Pradesh Power Corporation Limited vide the PPA through RESCO mode under feeder level solarization of Pradhan Mantri Kisan Urja Suraksha Evam Utthan Mahabhiyan Scheme (PM KUSUM) Component C-2 Scheme.) 19-05-2026
49 UPERC (UPNEDA, UPPCL - Approval of Power Purchase Agreements executed between Project Developers and Uttar Pradesh Power Corporation Limited and UPNEDA for adoption of tariff discovered through Request for Selection invited for procurement of power through tariff based competitive bidding process from grid connected solar plants connected to selected segregated agriculture feeder of distribution substation with cumulative capacity of 2553.5 MW for sale of power to Uttar Pradesh Power Corporation Limited vide the PPA through RESCO mode under feeder level solarization of Pradhan Mantri Kisan Urja Suraksha Evam Utthan Mahabhiyan Scheme (PM KUSUM) Component C-2 Scheme. 19-05-2026
50 UPERC (UPPCL - Approval for tender documents including the request for Qualification, Request for Proposal and Draft PPA to be floated by UPPCL for Procurement of 1000 MW of source Agnostic Peak Power for medium Term .) 19-05-2026
Officers Contact
Office of Chairperson
Sr. No. Name Designation Telephone Number Email Address
1 Shri Arvind Kumar Chairman
Office of Member 1
Sr. No. Name Designation Telephone Number Email Address
2 Shri V.K Srivastava Member (Law) +91-0522-2720421 vksrivastava@uperc.org
Office of Member 2
Sr. No. Name Designation Telephone Number Email Address
3 Dr. Sanjay Kumar Singh Member +91-0522-2720424 sanjay@uperc.org
Office of Secretary
Sr. No. Name Designation Telephone Number Email Address
4 Shri Shailendra Gaur Secretary 2720426 secretary@uperc.org
Sr. No. Name Designation Telephone Number Email Address
5 Shri Sumeet Kumar Agarwal Director (Distribution) 2720704 sumeet@uperc.org
6 Shri Shailendra Gaur Director (Transmission & SLDC) 2720295 shailendra@uperc.org
7 Dr. Amit Bhargava Director (Tariff) 2306824 amit@uperc.org
8 Shri Manoj Rastogi Director (Generation & PPA) 2720821 manoj@uperc.org
9 Shri. Atul Chaturvedi Joint Director (Administration) 2728931 atul@uperc.org
10 Shri Arun Kumar Yadav Sr. Finance & Accounts Officer 2720833 sfao@uperc.org
11 Shri Sarabjeet Singh Dhingra Joint Director (Distribution, Operation & Standards) 2721257 sarabjeet@uperc.org
12 Shri Abhishek Moza Joint Director (Transmission, Operation & Planning) 2721477 abhishekmoza@uperc.org
13 Shri Sajal Kumar Singh Joint Director (Computer Applications, IT and Information Management) 2721471 sajal@uperc.org
14 Shri Neeraj Agrawal Deputy Director, Accounts and Financial Analysis 2721255 neeraj@uperc.org
15 Shri Randhir Kumar Gupta" Deputy Director, (Generation, Planning, Procurement & PPA) randhir@uperc.org
16 Shri. Santosh Kumar Bhatt" Account Officer 2720833 skbhatt@uperc.org