Department of Management Sciences (DoMS) Indian Institute of Technology Kanpur
About UERC

The Uttaranchal Electricity Regulatory Commission (later Uttarakhand Electricity Regulatory Commission) was constituted in September 2002. Section 3 of the Uttaranchal (Uttar Pradesh Electricity Reforms Act) Adaptation and Modification Order, 2001 (Adaptation Order) provided for the establishment of the Uttaranchal Electricity Regulatory Commission (later Uttarakhand Electricity Regulatory Commission).

Functions of the Commission:

Section 86 of the Electricity Act, 2003 provides that the State Commission would discharge the following functions:

  • Determine the tariff for generation, supply, transmission and wheeling of electricity, wholesale, bulk or retail, as the case may be, within the State: Provided that where open access has been permitted to a category of consumers under section 42, the State Commission shall determine only the wheeling charges and surcharge thereon, if any, for the said category of consumers.
  • Regulate electricity purchase and procurement process of distribution licensees including the price at which electricity shall be procured from the generating companies or licensees or from other sources through agreements for purchase of power for distribution and supply within the State.
  • Facilitate intra-State transmission and wheeling of electricity.
  • Issue licenses to persons seeking to act as transmission licensees, distribution licensees and electricity traders with respect to their operations within the State.
  • Promote cogeneration and generation of electricity from renewable sources of energy by providing suitable measures for connectivity with the grid and sale of electricity to any person, and also specify, for purchase of electricity from such sources, a percentage of the total consumption of electricity in the area of a distribution licensee.
  • Promote cogeneration and generation of electricity from renewable sources of energy by providing suitable measures for connectivity with the grid and sale of electricity to any person, and also specify, for purchase of electricity from such sources, a percentage of the total consumption of electricity in the area of a distribution licensee.
  • Adjudicate upon the disputes between the licensees and generating companies and to refer any dispute for arbitration.
  • Levy fee for the purposes of this Act.
  • Specify State Grid Code consistent with the Grid Code specified under clause (h) of sub-section (1) of section 79.
  • Specify or enforce standards with respect to quality, continuity and reliability of service by licensees.
  • Fix the trading margin in the intra-State trading of electricity, if considered, necessary. Discharges such other functions as may be assigned to it under this Act. Under the Electricity Act, 2003 the Commission shall also advise the State Government on all matters pertaining to:
    • Promotion of competition, efficiency and economy in activities of the electricity industry
    • Promotion of investment in electricity industry; reorganization and restructuring of electricity industry in the State Matters concerning generation, transmission, distribution and trading of electricity or any other matter referred by the Government.
Powers of the Commission:

Section 94 of Electricity Act, 2003 on power vested with the state Commission provides as follows:

  • The Appropriate Commission shall, for the purposes of any inquiry or proceedings under this Act, have the same powers as are vested in a civil court under the Code of Civil Procedure, 1908 in respect of the following matters, namely: -
    • summoning and enforcing the attendance of any person and examining him on oath;
    • discovery and production of any document or other material object producible as evidence;
    • receiving evidence on affidavits;
    • requisitioning of any public record;
    • issuing commission for the examination of witnesses;
    • reviewing its decisions, directions and orders;
    • any other matter which may be prescribed.
  • The Appropriate Commission shall have the powers to pass such interim order in any proceeding, hearing or matter before the Appropriate Commission, as that Commission may consider appropriate.
  • The Appropriate Commission may authorize any person, as it deems fit, to represent the interest of the consumers in the proceedings before it.
UERC Snapshot of power sector
Installed Capacity (As on 31-Aug-2026)
State Ownership Technology wise breakup (MW) Grand Total
Thermal Nuclear Renewable
Coal Lignite Gas Diesel Total Hydro RES(MNRE)
Uttarakhand

Link- https://cea.nic.in/wp-content/uploads/installed/2023/10/IC_OCT_2023-1.pdf

Generating units (As on 30.09.2023)
Name of Utility/Power Station UTILITY Ownership Type Energy Source Installed Capacity (MW)
Koteshwar HEP THDC Central Hydro 400
Shrinagar HEP Alaknanda HPCL Private Hydro 330
Gama Infraprop 225 MW Gas Based CCPP Gama Infraprop Pvt. Private Thermal-Gas RLNG 214
Jaypee Vishnuprayag HEP JP Power Ventures Ltd. Private Hydro 400
Chibro (Yamuna)HPS Uttarakhand JVNL State Hydro 240
Chilla HPS Uttarakhand JVNL State Hydro 144
Dhakrani HPS Uttarakhand JVNL State Hydro 34
Dhalipur HPS Uttarakhand JVNL State Hydro 51
Khatima HPS Uttarakhand JVNL State Hydro 41
Khodri HPS Uttarakhand JVNL State Hydro 120
Kulhal HPS Uttarakhand JVNL State Hydro 30
Tiloth HPS Uttarakhand JVNL State Hydro 90
Maneri Bhali - II HPS Uttarakhand JVNL State Hydro 304
Ramganga HPS Uttarakhand JVNL State Hydro 198
Dhauli Ganga HPS NHPC Ltd. Central Hydro 280
Tanakpur HPS NHPC Ltd. Central Hydro 94
Tehri HPP THDC Central Hydro 1000

Link- https://cea.nic.in/wp-content/uploads/executive/2023/09/R1_Executive_Summary_September_2023.pdf

Energy Sales (MUs) for UPCL discom
Sr. No. Consumer Category 2023-24
1 Domestic 3997
2 Non Domestic 1764
3 Government Public Utilties 788
4 Private Tubewell/ Pump Sets 291
5 LT & HT Industry 7669
6 Mixed Load 211
7 Railway Traction 88
8 Additional Sales 4
Total 14812

Link- https://uerc.gov.in/Tariff_Orders_of_FY_2023-24/Tariff%20Orders%20dt.%2030.03.2023/UPCL/Tariff%20Order%20of%20UPCL%20for%20FY%202023-24.pdf

Breakup of RE (MW) (As on 31.03.2024)
States / UTs Small Hydro Wind BM Cogen. (Bagasse) BM Cogen. (Non- Bagasse) Waste to Energy Waste to Energy (Off-grid) Ground-Mounted Solar Rooftop Solar Hybrid Solar Off-grid Solar Total Capacity
UERC 219 0 73 58 10 298 263 0 14 934

Link- https://cdnbbsr.s3waas.gov.in/s3716e1b8c6cd17b771da77391355749f3/uploads/2023/11/202311081719950808.pdf

Average Cost of Supply (ACoS) (Rs./ kWh)
Sr. No. DISCOMs 2023-24
1 UPCL 7.01
Latest Documents
S. No. Title Date
1 UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Station) (2nd Amendment) Regulations, 2025 27-11-2025
2 UERC (Guidelines for Appointment of Members and Procedure to be followed by the Forum for Redressal of Grievances of the Consumers) (Third Amendment) Regulations, 2024 01-01-2025
3 Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2024 17-09-2024
4 Draft Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2024 29-06-2024
5 Draft UERC (Terms and Conditions for Determination of Multi Year Tariff Regulation, 2024 (SoR) 27-06-2024
6 UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (First Amendment) Regulations, 2024 01-05-2024
7 Alignment of timelines for connections as per Electricity Amendment Rules 2024 and Easy-to-understand Bills. 27-03-2024
8 UERC (Green Energy Open Access) Regulations, 2023 18-10-2023
9 UERC(Green Energy Open Access) Regulations, 2023. 18-10-2023
10 UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2023 16-08-2023
11 UERC (Terms and Conditions for Determination of Multi Year Tariff) (Second Amendment) Regulations, 2023. 16-08-2023
12 UERC (Green Energy Open Access Regulations), 2023 [Draft] 18-07-2023
13 UERC ( (Green Energy Open Access) (3rd Amendment), MoP (2nd Amendment), 2023 18-07-2023
14 UERC (Green Energy Open Access Regulations)(1st amendment), MoP(1st amendment) 2023 [Draft] 18-07-2023
15 UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (1st Amd) Regulations, 2023 21-03-2023
16 UERC (Standards of Performance) Regulations, 2022 08-10-2022
17 UERC (Standards of Performance) Regulations, 2022 22-09-2022
18 UERC (State Grid Code) (1st Amd) Regulations, 2022 30-07-2022
19 UERC (Deviation Settlement Mechanism and Related Matters) (1st Amd) Regulations, 2022 19-07-2022
20 UERC (Terms and Conditions for Determination of Multi Year Tariff) (First Amendment) Regulations, 2022 11-06-2022
21 UERC (Standards of Performance) Regulations, 2022 [Draft] 08-06-2022
22 UERC (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2021 14-09-2021
23 UERC (Terms & Conditions for Determination of Multi Year Tariff) Regulations, 2021 14-09-2021
24 UERC (Appointment & Functioning of Ombudsman) (5th Amd) Regulations, 2021 26-04-2021
25 UERC (Guidelines for Appointment of Members and Procedure to be followed by the Forum for Redressal of Grievances of the Consumers) (2nd Amd), 2021 30-01-2021
26 UERC (Guidelines for Appointment of Members and Procedure to be followed by the Forum for Redressal of Grievances of the Consumers) (2nd Amd) Regulations, 2021 12-01-2021
27 UERC (Terms & Conditions for Determination of Multi Year Tariff) (1st Amd) Regulations, 2020 26-11-2020
28 UERC (Terms & Conditions for Determination of Multi Year Tariff) (1st Amd) Regulations (SOR), 2020 26-11-2020
29 UERC (Terms and Conditions for Determination of Multi Year Tariff) (First Amendment) Regulations, 2020. 26-11-2020
30 UERC (The Electricity Supply Code, Release of New Connections and Related Matters) Regulations, 2020 29-10-2020
31 UERC (Guidelines for Appointment of Members and Procedure to be followed by the Forum for Redressal of Grievances of the Consumers) (1st Amd) 2019 09-09-2019
32 UERC (Guidelines for Appointment of Members and Procedure to be followed by the Forum for Redressal of Grievances of the Consumers) (1st Amd) Regulations, 2019 09-09-2019
33 UERC (Guidelines for Appointment of Members and Procedure to be followed by the Forum for Redressal of Grievances of the Consumers), 2019 22-01-2019
34 UERC (Guidelines for Appointment of Members and Procedure to be followed by the Forum for Redressal of Grievances of the Consumers) Regulations, 2019 22-01-2019
35 UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2018 22-09-2018
36 UERC (Terms & Conditions for Determination of Multi Year Tariff) Regulations, 2018 14-09-2018
37 UERC (Terms & Conditions for Determination of Multi Year Tariff) Regulations (SOR), 2018 14-09-2018
38 UttaUERC (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2018 14-09-2018
39 UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations (SOR), 2018 06-09-2018
40 UERC (Terms & Conditions of Intra-State Open Access) (2nd Amd) Regulations, 2018 18-06-2018
41 UERC (Terms & Conditions of Intra-State Open Access) (2nd Amd) Regulations (SOR), 2018 18-06-2018
42 UttaraUERC (Terms and Conditions of IntraState Open Access) (Second Amendment) Regulations, 2018 18-06-2018
43 UERC (Distribution Code) Regulations (SOR), 2018 31-03-2018
44 UERC (Distribution Code) Regulations, 2018 31-03-201821-04-2018
45 UERC (Fees & Fines) (2nd Amd) Regulations, 2018 17-03-2018
46 UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (6th Amd) Regulations, 2017 08-09-2017
47 UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (3rd Amd) Regulations, 2017 08-09-2017
48 UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (3rd & 6th Amd) Regulations (SOR), 2017 08-09-2017
49 UERC (Terms & Conditions for Determination of Multi Year Tariff) (2nd Amd) Regulations, 2017 17-07-2017
50 UERC (Terms & Conditions for Determination of Multi Year Tariff) (2nd Amd) Regulations (SOR), 2017 17-07-2017
Latest Documents
S. No. Title Date
1 UERC (True up for FY 2024-25, Annual Performance Review for FY 2025-26 & ARR for FY 2026-27 For M-s Greenko Budhil Hydro Power Pvt. Ltd.) 27-05-2026
2 UERC (Annual Performance Review For FY 2025-26 and Revised ARR for FY 2026-27 For SLDC of Uttarakhand) 30-03-2026
3 UERC (Interim Order On ARR for FY 2026-27 For M-s Gama Infraprop Pvt. Ltd) 30-03-2026
4 UERC (Interim Order On ARR for FY 2026-27 For M-s Sravanthi Energy Pvt. Ltd.) 30-03-2026
5 UERC (Tariff Order UPCL for FY 2026-27– Highlights-PRESS NOTE) 03-03-2026
6 UERC (Tariff Order for PTCUL for FY 2026-27 Highlights-PRESS NOTE) 03-03-2026
7 UERC (Tariff Order for UJVN Ltd. for FY 2026-27_Highlights-PRESS NOTE) 03-03-2026
8 UERC (Petition for True up of FY 2024-25, APR for FY 2025-26 and determination of ARR for FY 2026-27) 26-12-2025
9 UERC (UJVN Ltd.'s Petitions for True up of FY 2024-25, APR for FY 2025-26 and determination of AFC for FY 2026-27 for 11 Large Hydro Plants (LHPs) of UJVN Ltd.) 26-12-2025
10 UERC (Petitions for Approval of True-up for FY 2024-25, APR for FY 2025-26 and ARR for FY 2026-27 of PTCUL) 26-12-2025
11 UERC (Petitions for Approval of True-up for FY 2024-25, APR for FY 2025-26 and ARR for FY 2026-27 of SLDC) 26-12-2025
12 UERC (SLDC’s Petition for approval of Business Plan for the Control Period FY 2022-23 to FY 2024-25) 02-12-2025
13 UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Station) (2nd Amendment) Regulations, 2025 27-11-2025
14 UPCL (Approval of Business Plan and Multi Year Tariff for Fifth Control Period (FY 2025- 26 to FY 2027-28), Annual Performance Review for FY 2024-25, and True-up for FY 2023-24 for UJVN Ltd) 28-10-2025
15 UERC (Approval of Business Plan and Multi Year Tariff for Fifth Control Period (FY 2025- 26 to FY 2027-28), APR for FY 2024-25, and True-up for FY 2023-24 for UJVN Ltd.) 28-10-2025
16 UERC (True up for FY 2023-24, Annual Performance Review for FY 2024-25 & ARR for FY 2025-26 For M/s Sravanthi Energy Pvt Ltd) 11-08-2025
17 UERC( Approval of Business Plan and Multi Year Tariff Petition For M-s Greenko Budhil Hydro Power Pvt. Ltd. For Fifth Control Period (FY 2025-26 to FY 2027-28)) 11-08-2025
18 UPCL (Approval of Capital Cost, True-up for FY 2022-23, and Annual Fixed Charges for FY 2024-25 for Vyasi Hydro Power Project (2x60 MW).) 15-07-2025
19 UERC order on (Application seeking approval of the Fuel and Power Purchase Cost Adjustment (FPPCA) charged from/refunded to the consumers against the incremental power purchase cost for the quarter ending December, 2024) 2025 22-05-2025
20 UERC order on (Application seeking approval of the Commission for deviation/modification and/or clarification in specific clauses of the bidding documents (RFQ, RFP, and APP) issued for procurement of 500 MW RTC coal-based power under Medium-Term procurement) 2025 15-05-2025
21 UERC order on (Application seeking approval of the Commission for deviation/modification and/or clarification in specific clauses of the RFQ issued for procurement of 1320 MW RTC coal-based power under Long-Term procurement) 2025 09-05-2025
22 UERC order on (Petition under Section 61, 62 & 86 of the EA, 2003 read with Regulation 50(6) of the UERC (Terms & Conditions for Determination of Multi Year Tariff) Regulations, 2018 & 2021 for recovery of under recovered energy charges due to shortfall in energy generation for reasons beyond the control of generating stations during the FY 2020-21 in respect of Dhakrani, Dhalipur and Kulhal Hydro Power Stations of UJVN Ltd) 2025 09-05-2025
23 UERC order on (Additional security deposit amount levied 3 times of fortnightly bill by Uttarakhand Power Corporation Limited from April 2024 onwards in monthly electricity bills being issued) 2025 08-05-2025
24 UERC order on (Application seeking approval of the Commission on Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Rai Bahadur Narain Singh Sugar Mills Ltd. – 30 MW (Surplus 19.1 MW to UPCL)) 30-04-2025
25 Approval of Business Plan and Multi Year Tariff Petition For Uttarakhand Power Corporation Ltd. For Control Period (FY 2025-26 to FY 2027-28) 11-04-2025
26 UERC order on (Petition filed by Uttarakhand Power Corporation Limited for True Up of FY 2023-24, Annual Performance Review for FY 2024-25 and ARR & Tariff for FY 2025-26), 2025 11-04-2025
27 UERC (Approval of Business Plan and Multi Year Tariff Petition For Power Transmission Corporation of Uttarakhand Ltd. For Fifth Control Period (FY 2025-26 to FY 2027-28)) 11-04-2025
28 UERC (Approval of Business Plan and Multi Year Tariff for Fifth Control Period (FY 2025-26 to FY 2027-28) Annual Performance Review for FY 2024-25 & True Up for FY 2023-24 For UJVN Ltd) 11-04-2025
29 UERC (Approval of Business Plan and Multi Year Tariff Petition For M/s Gama Infraprop Pvt. Ltd. For Fifth Control Period (FY 2025-26 to FY 2027-28)) 11-04-2025
30 Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL arising out of its obligation to supply electricity to the open access consumers for the period April 2025 to September 2025 08-04-2025
31 Petition for Investment Approval for “Supply & erection of Substation Automation System (SAS) at 220/33 kV Substation Jafarpur and 220/132/33 kV Substation Kamaluaganja 24-03-2025
32 UERC (Approval of Capital Cost, True-up for FY 2022-23, & Annual Fixed Charges for FY 2024-25 For Vyasi Hydro Electric Project Of UJVN Ltd) 24-03-2025
33 Review of UERC Order dated 30.09.2024 with regard to “Determination of Additional Surcharge in accordance with the provisions of UERC (Terms and Conditions of IntraState Open Access) Regulations, 2015 to meet the fixed cost of UPCL arising out of its obligation to supply electricity to the Open Access Consumers for the period 01.10.2024 to 31.03.2025 12-03-2025
34 Application seeking approval of the Fuel and Power Purchase Cost Adjustment (FPPCA) charged from/refunded to the consumers against the incremental power purchase cost for the quarter ending September, 2024 11-03-2025
35 Investment Approval for DPR of “Augmentation of 132 kV S/s Purkul, Dehradun from 100 MVA (2x40 MVA + 1x20 MVA) to 120 MVA (3x40 MVA) transformer at 132/33 kV Voltage level 10-02-2025
36 Petition for Investment Approval of Revised DPR of “Construction of 132 kV Bindal–Purkul Transmission Line including underground cabling work between tower No. 47 and 50 24-01-2025
37 Petition for Investment Approval for “Augmentation of Transformation capacity from 2x40 MVA (132/33 KV) to 3x40 MVA (132/33 KV) by procurement, installation, testing & commissioning of 01 No. additional 132/33 KV 40 MVA T/F and construction of associated 132/33 KV bay at 220 KV S/s Virbhadra, Rishikesh 22-01-2025
38 UPCL (MYT for the Control Period from FY 2025-26 to FY 2027-28, Trueup for FY 2023-24 and Annual Performance Review for FY 2024-25) 08-01-2025
39 UPCL (Petition for approval of Business Plan for the Control Period FY 2025-26 to FY 2027-28) 08-01-2025
40 UERC (UJVN Ltd.'s Petition seeking approval of its Business Plan for FY 2025-26 to FY 2027- 28) 08-01-2025
41 UERC (UPCL’s Petition for approval of MYT for the Control Period from FY 2025-26 to FY 2027-28, Trueup for FY 2023-24 and Annual Performance Review for FY 2024-25.) 08-01-2025
42 Petition seeking approval of the Commission for Advance & Return Energy Banking to M/s Uttar Pradesh Power Corporation Limited under an Energy Banking Agreement with the Uttarakhand Power Corporation Ltd 06-01-2025
43 Petition seeking Approval of Releasing of Additional 2000 kVA Load (Total Contracted Load of 12000 kVA) on a Supply Voltage Line of 33 kV and thereby providing relaxation over Regulation No. 2.1 (4) of the UERC (The Electricity Supply Code, Release of New Connections and Related Matters) Regulations, 2020 24-12-2024
44 Application seeking approval of the Fuel and Power Purchase Cost Adjustment (FPPCA) charged from/refunded to the consumers against the incremental power purchase cost for the quarter ending June, 2024 09-12-2024
45 Petition seeking prior approval of the Commission for Advance & Return Energy Banking to M/s Haryana Power Purchase Centre under an Energy Banking Agreement with Uttarakhand Power Corporation Ltd. 22-11-2024
46 Petition seeking approval of capital investment on Rehabilitation works of civil structure of Ichari Dam under Section 61 and 86 of the Electricity Act, 2003 read with the relevant regulations and guidelines of the Commission 21-11-2024
47 Hon’ble APTEL’s Judgement dated 19.07.2024 on Appeal no. 215 of 2016, Appeal No. 283 of 2016 & Appeal No. 139 of 2018 w.r.t. ‘Denial of 50% of the excess IDC and 50% of Price Variation component of capital cost for MB-II project’ 20-11-2024
48 Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2024-25 and onwards till reviewed/revised by the Commission 19-11-2024
49 Petition for fixation of voltage wise distribution loss or reduction of approved distribution loss for open access captive solar power plants under Uttarakhand State Solar Policy-2023. 28-10-2024
50 Application seeking review of the UERC’s Tariff Order on True-up for FY 2022-23, Annual Performance Review for FY 2023-24 and Annual Fixed Charges for FY 2024-25 10-10-2024
Officers Contact
S. No. Name Designation Phone
1Sh. M. L. PrasadChairman2643755
2Sh. Anurag SharmaMember-Law2642179
3Sh. Prabhat Kishor DimriMember-Technical2641133
4Sh. Neeraj SatiSecretary2643799
5Sh. Gaurav SharmaDirector (Costing/Licensing)2641747
6Sh. Radhyshyam BelwalDy. Director (Accounts)2643955
7Sh. Gaurav LohaniAssistant Director (Tariff)2643955
8Sh. Abhishek PandeyDy. Director (Technical)2643944
9Sh. Yashwardhan DimriDirector (Technical)2641115
10Sh. Mukesh C. VermaDy. Director (IT)2641119
11Sh. Shivanku BhattAssistant Director (Law)2641115
12Sh. Deepak KumarDy. Director (Administration)2641119
13Sh. Deepak PandeyDirector (Finance)2641113
14Sh. Gaurav SabharwalJoint Director (Finance/Tariff)2641747
15Sh. Praveen KumarAccounts Officer2643955
16Sh. Vineet MallAssistant Director (Costing/Licensing)2641115
Go to Top