About UERC

The Uttaranchal Electricity Regulatory Commission (later Uttarakhand Electricity Regulatory Commission) was constituted in September 2002. Section 3 of the Uttaranchal (Uttar Pradesh Electricity Reforms Act) Adaptation and Modification Order, 2001 (Adaptation Order) provided for the establishment of the Uttaranchal Electricity Regulatory Commission (later Uttarakhand Electricity Regulatory Commission).

Functions of the Commission:

Section 86 of the Electricity Act, 2003 provides that the State Commission would discharge the following functions:

  • Determine the tariff for generation, supply, transmission and wheeling of electricity, wholesale, bulk or retail, as the case may be, within the State: Provided that where open access has been permitted to a category of consumers under section 42, the State Commission shall determine only the wheeling charges and surcharge thereon, if any, for the said category of consumers.
  • Regulate electricity purchase and procurement process of distribution licensees including the price at which electricity shall be procured from the generating companies or licensees or from other sources through agreements for purchase of power for distribution and supply within the State.
  • Facilitate intra-State transmission and wheeling of electricity.
  • Issue licenses to persons seeking to act as transmission licensees, distribution licensees and electricity traders with respect to their operations within the State.
  • Promote cogeneration and generation of electricity from renewable sources of energy by providing suitable measures for connectivity with the grid and sale of electricity to any person, and also specify, for purchase of electricity from such sources, a percentage of the total consumption of electricity in the area of a distribution licensee.
  • Promote cogeneration and generation of electricity from renewable sources of energy by providing suitable measures for connectivity with the grid and sale of electricity to any person, and also specify, for purchase of electricity from such sources, a percentage of the total consumption of electricity in the area of a distribution licensee.
  • Adjudicate upon the disputes between the licensees and generating companies and to refer any dispute for arbitration.
  • Levy fee for the purposes of this Act.
  • Specify State Grid Code consistent with the Grid Code specified under clause (h) of sub-section (1) of section 79.
  • Specify or enforce standards with respect to quality, continuity and reliability of service by licensees.
  • Fix the trading margin in the intra-State trading of electricity, if considered, necessary. Discharges such other functions as may be assigned to it under this Act. Under the Electricity Act, 2003 the Commission shall also advise the State Government on all matters pertaining to:
    • Promotion of competition, efficiency and economy in activities of the electricity industry
    • Promotion of investment in electricity industry; reorganization and restructuring of electricity industry in the State Matters concerning generation, transmission, distribution and trading of electricity or any other matter referred by the Government.
Powers of the Commission:

Section 94 of Electricity Act, 2003 on power vested with the state Commission provides as follows:

  • The Appropriate Commission shall, for the purposes of any inquiry or proceedings under this Act, have the same powers as are vested in a civil court under the Code of Civil Procedure, 1908 in respect of the following matters, namely: -
    • summoning and enforcing the attendance of any person and examining him on oath;
    • discovery and production of any document or other material object producible as evidence;
    • receiving evidence on affidavits;
    • requisitioning of any public record;
    • issuing commission for the examination of witnesses;
    • reviewing its decisions, directions and orders;
    • any other matter which may be prescribed.
  • The Appropriate Commission shall have the powers to pass such interim order in any proceeding, hearing or matter before the Appropriate Commission, as that Commission may consider appropriate.
  • The Appropriate Commission may authorize any person, as it deems fit, to represent the interest of the consumers in the proceedings before it.
UERC Snapshot of power sector
Installed Capacity (As on 31-Jan-2026)
State Ownership Technology wise breakup (MW) Grand Total
Thermal Nuclear Renewable
Coal Lignite Gas Diesel Total Hydro RES(MNRE)
Uttarakhand

Link- https://cea.nic.in/wp-content/uploads/installed/2023/10/IC_OCT_2023-1.pdf

Generating units (As on 30.09.2023)
Name of Utility/Power Station UTILITY Ownership Type Energy Source Installed Capacity (MW)
Koteshwar HEP THDC Central Hydro 400
Shrinagar HEP Alaknanda HPCL Private Hydro 330
Gama Infraprop 225 MW Gas Based CCPP Gama Infraprop Pvt. Private Thermal-Gas RLNG 214
Jaypee Vishnuprayag HEP JP Power Ventures Ltd. Private Hydro 400
Chibro (Yamuna)HPS Uttarakhand JVNL State Hydro 240
Chilla HPS Uttarakhand JVNL State Hydro 144
Dhakrani HPS Uttarakhand JVNL State Hydro 34
Dhalipur HPS Uttarakhand JVNL State Hydro 51
Khatima HPS Uttarakhand JVNL State Hydro 41
Khodri HPS Uttarakhand JVNL State Hydro 120
Kulhal HPS Uttarakhand JVNL State Hydro 30
Tiloth HPS Uttarakhand JVNL State Hydro 90
Maneri Bhali - II HPS Uttarakhand JVNL State Hydro 304
Ramganga HPS Uttarakhand JVNL State Hydro 198
Dhauli Ganga HPS NHPC Ltd. Central Hydro 280
Tanakpur HPS NHPC Ltd. Central Hydro 94
Tehri HPP THDC Central Hydro 1000

Link- https://cea.nic.in/wp-content/uploads/executive/2023/09/R1_Executive_Summary_September_2023.pdf

Energy Sales (MUs) for UPCL discom
Sr. No. Consumer Category 2023-24
1 Domestic 3997
2 Non Domestic 1764
3 Government Public Utilties 788
4 Private Tubewell/ Pump Sets 291
5 LT & HT Industry 7669
6 Mixed Load 211
7 Railway Traction 88
8 Additional Sales 4
Total 14812

Link- https://uerc.gov.in/Tariff_Orders_of_FY_2023-24/Tariff%20Orders%20dt.%2030.03.2023/UPCL/Tariff%20Order%20of%20UPCL%20for%20FY%202023-24.pdf

Breakup of RE (MW) (As on 31.03.2024)
States / UTs Small Hydro Wind BM Cogen. (Bagasse) BM Cogen. (Non- Bagasse) Waste to Energy Waste to Energy (Off-grid) Ground-Mounted Solar Rooftop Solar Hybrid Solar Off-grid Solar Total Capacity
UERC 219 0 73 58 10 298 263 0 14 934

Link- https://cdnbbsr.s3waas.gov.in/s3716e1b8c6cd17b771da77391355749f3/uploads/2023/11/202311081719950808.pdf

Average Cost of Supply (ACoS) (Rs./ kWh)
Sr. No. DISCOMs 2023-24
1 UPCL 7.01
Latest Documents
S. No. Title Date
1 UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Station) (2nd Amendment) Regulations, 2025 27-11-2025
2 UERC (Guidelines for Appointment of Members and Procedure to be followed by the Forum for Redressal of Grievances of the Consumers) (Third Amendment) Regulations, 2024 01-01-2025
3 Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2024 17-09-2024
4 Draft Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2024 29-06-2024
5 Draft UERC (Terms and Conditions for Determination of Multi Year Tariff Regulation, 2024 (SoR) 27-06-2024
6 UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (First Amendment) Regulations, 2024 01-05-2024
7 Alignment of timelines for connections as per Electricity Amendment Rules 2024 and Easy-to-understand Bills. 27-03-2024
8 UERC (Green Energy Open Access) Regulations, 2023 18-10-2023
9 UERC(Green Energy Open Access) Regulations, 2023. 18-10-2023
10 UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2023 16-08-2023
11 UERC (Terms and Conditions for Determination of Multi Year Tariff) (Second Amendment) Regulations, 2023. 16-08-2023
12 UERC (Green Energy Open Access Regulations), 2023 [Draft] 18-07-2023
13 UERC ( (Green Energy Open Access) (3rd Amendment), MoP (2nd Amendment), 2023 18-07-2023
14 UERC (Green Energy Open Access Regulations)(1st amendment), MoP(1st amendment) 2023 [Draft] 18-07-2023
15 UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (1st Amd) Regulations, 2023 21-03-2023
16 UERC (Standards of Performance) Regulations, 2022 08-10-2022
17 UERC (Standards of Performance) Regulations, 2022 22-09-2022
18 UERC (State Grid Code) (1st Amd) Regulations, 2022 30-07-2022
19 UERC (Deviation Settlement Mechanism and Related Matters) (1st Amd) Regulations, 2022 19-07-2022
20 UERC (Terms and Conditions for Determination of Multi Year Tariff) (First Amendment) Regulations, 2022 11-06-2022
21 UERC (Standards of Performance) Regulations, 2022 [Draft] 08-06-2022
22 UERC (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2021 14-09-2021
23 UERC (Terms & Conditions for Determination of Multi Year Tariff) Regulations, 2021 14-09-2021
24 UERC (Appointment & Functioning of Ombudsman) (5th Amd) Regulations, 2021 26-04-2021
25 UERC (Guidelines for Appointment of Members and Procedure to be followed by the Forum for Redressal of Grievances of the Consumers) (2nd Amd), 2021 30-01-2021
26 UERC (Guidelines for Appointment of Members and Procedure to be followed by the Forum for Redressal of Grievances of the Consumers) (2nd Amd) Regulations, 2021 12-01-2021
27 UERC (Terms & Conditions for Determination of Multi Year Tariff) (1st Amd) Regulations, 2020 26-11-2020
28 UERC (Terms & Conditions for Determination of Multi Year Tariff) (1st Amd) Regulations (SOR), 2020 26-11-2020
29 UERC (Terms and Conditions for Determination of Multi Year Tariff) (First Amendment) Regulations, 2020. 26-11-2020
30 UERC (The Electricity Supply Code, Release of New Connections and Related Matters) Regulations, 2020 29-10-2020
31 UERC (Guidelines for Appointment of Members and Procedure to be followed by the Forum for Redressal of Grievances of the Consumers) (1st Amd) 2019 09-09-2019
32 UERC (Guidelines for Appointment of Members and Procedure to be followed by the Forum for Redressal of Grievances of the Consumers) (1st Amd) Regulations, 2019 09-09-2019
33 UERC (Guidelines for Appointment of Members and Procedure to be followed by the Forum for Redressal of Grievances of the Consumers), 2019 22-01-2019
34 UERC (Guidelines for Appointment of Members and Procedure to be followed by the Forum for Redressal of Grievances of the Consumers) Regulations, 2019 22-01-2019
35 UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2018 22-09-2018
36 UERC (Terms & Conditions for Determination of Multi Year Tariff) Regulations, 2018 14-09-2018
37 UERC (Terms & Conditions for Determination of Multi Year Tariff) Regulations (SOR), 2018 14-09-2018
38 UttaUERC (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2018 14-09-2018
39 UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations (SOR), 2018 06-09-2018
40 UERC (Terms & Conditions of Intra-State Open Access) (2nd Amd) Regulations, 2018 18-06-2018
41 UERC (Terms & Conditions of Intra-State Open Access) (2nd Amd) Regulations (SOR), 2018 18-06-2018
42 UttaraUERC (Terms and Conditions of IntraState Open Access) (Second Amendment) Regulations, 2018 18-06-2018
43 UERC (Distribution Code) Regulations (SOR), 2018 31-03-2018
44 UERC (Distribution Code) Regulations, 2018 31-03-201821-04-2018
45 UERC (Fees & Fines) (2nd Amd) Regulations, 2018 17-03-2018
46 UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (6th Amd) Regulations, 2017 08-09-2017
47 UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (3rd Amd) Regulations, 2017 08-09-2017
48 UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (3rd & 6th Amd) Regulations (SOR), 2017 08-09-2017
49 UERC (Terms & Conditions for Determination of Multi Year Tariff) (2nd Amd) Regulations, 2017 17-07-2017
50 UERC (Terms & Conditions for Determination of Multi Year Tariff) (2nd Amd) Regulations (SOR), 2017 17-07-2017
Latest Documents
S. No. Title Date
1 UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Station) (2nd Amendment) Regulations, 2025 27-11-2025
2 UERC (True up for FY 2023-24, Annual Performance Review for FY 2024-25 & ARR for FY 2025-26 For M/s Sravanthi Energy Pvt Ltd) 11-08-2025
3 UERC( Approval of Business Plan and Multi Year Tariff Petition For M-s Greenko Budhil Hydro Power Pvt. Ltd. For Fifth Control Period (FY 2025-26 to FY 2027-28)) 11-08-2025
4 UERC order on (Application seeking approval of the Fuel and Power Purchase Cost Adjustment (FPPCA) charged from/refunded to the consumers against the incremental power purchase cost for the quarter ending December, 2024) 2025 22-05-2025
5 UERC order on (Application seeking approval of the Commission for deviation/modification and/or clarification in specific clauses of the bidding documents (RFQ, RFP, and APP) issued for procurement of 500 MW RTC coal-based power under Medium-Term procurement) 2025 15-05-2025
6 UERC order on (Application seeking approval of the Commission for deviation/modification and/or clarification in specific clauses of the RFQ issued for procurement of 1320 MW RTC coal-based power under Long-Term procurement) 2025 09-05-2025
7 UERC order on (Petition under Section 61, 62 & 86 of the EA, 2003 read with Regulation 50(6) of the UERC (Terms & Conditions for Determination of Multi Year Tariff) Regulations, 2018 & 2021 for recovery of under recovered energy charges due to shortfall in energy generation for reasons beyond the control of generating stations during the FY 2020-21 in respect of Dhakrani, Dhalipur and Kulhal Hydro Power Stations of UJVN Ltd) 2025 09-05-2025
8 UERC order on (Additional security deposit amount levied 3 times of fortnightly bill by Uttarakhand Power Corporation Limited from April 2024 onwards in monthly electricity bills being issued) 2025 08-05-2025
9 UERC order on (Application seeking approval of the Commission on Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Rai Bahadur Narain Singh Sugar Mills Ltd. – 30 MW (Surplus 19.1 MW to UPCL)) 30-04-2025
10 Approval of Business Plan and Multi Year Tariff Petition For Uttarakhand Power Corporation Ltd. For Control Period (FY 2025-26 to FY 2027-28) 11-04-2025
11 UERC order on (Petition filed by Uttarakhand Power Corporation Limited for True Up of FY 2023-24, Annual Performance Review for FY 2024-25 and ARR & Tariff for FY 2025-26), 2025 11-04-2025
12 UERC (Approval of Business Plan and Multi Year Tariff Petition For Power Transmission Corporation of Uttarakhand Ltd. For Fifth Control Period (FY 2025-26 to FY 2027-28)) 11-04-2025
13 UERC (Approval of Business Plan and Multi Year Tariff Petition For M/s Gama Infraprop Pvt. Ltd. For Fifth Control Period (FY 2025-26 to FY 2027-28)) 11-04-2025
14 Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL arising out of its obligation to supply electricity to the open access consumers for the period April 2025 to September 2025 08-04-2025
15 Petition for Investment Approval for “Supply & erection of Substation Automation System (SAS) at 220/33 kV Substation Jafarpur and 220/132/33 kV Substation Kamaluaganja 24-03-2025
16 Review of UERC Order dated 30.09.2024 with regard to “Determination of Additional Surcharge in accordance with the provisions of UERC (Terms and Conditions of IntraState Open Access) Regulations, 2015 to meet the fixed cost of UPCL arising out of its obligation to supply electricity to the Open Access Consumers for the period 01.10.2024 to 31.03.2025 12-03-2025
17 Application seeking approval of the Fuel and Power Purchase Cost Adjustment (FPPCA) charged from/refunded to the consumers against the incremental power purchase cost for the quarter ending September, 2024 11-03-2025
18 Investment Approval for DPR of “Augmentation of 132 kV S/s Purkul, Dehradun from 100 MVA (2x40 MVA + 1x20 MVA) to 120 MVA (3x40 MVA) transformer at 132/33 kV Voltage level 10-02-2025
19 Petition for Investment Approval of Revised DPR of “Construction of 132 kV Bindal–Purkul Transmission Line including underground cabling work between tower No. 47 and 50 24-01-2025
20 Petition for Investment Approval for “Augmentation of Transformation capacity from 2x40 MVA (132/33 KV) to 3x40 MVA (132/33 KV) by procurement, installation, testing & commissioning of 01 No. additional 132/33 KV 40 MVA T/F and construction of associated 132/33 KV bay at 220 KV S/s Virbhadra, Rishikesh 22-01-2025
21 UPCL (MYT for the Control Period from FY 2025-26 to FY 2027-28, Trueup for FY 2023-24 and Annual Performance Review for FY 2024-25) 08-01-2025
22 UPCL (Petition for approval of Business Plan for the Control Period FY 2025-26 to FY 2027-28) 08-01-2025
23 Petition seeking approval of the Commission for Advance & Return Energy Banking to M/s Uttar Pradesh Power Corporation Limited under an Energy Banking Agreement with the Uttarakhand Power Corporation Ltd 06-01-2025
24 Petition seeking Approval of Releasing of Additional 2000 kVA Load (Total Contracted Load of 12000 kVA) on a Supply Voltage Line of 33 kV and thereby providing relaxation over Regulation No. 2.1 (4) of the UERC (The Electricity Supply Code, Release of New Connections and Related Matters) Regulations, 2020 24-12-2024
25 Application seeking approval of the Fuel and Power Purchase Cost Adjustment (FPPCA) charged from/refunded to the consumers against the incremental power purchase cost for the quarter ending June, 2024 09-12-2024
26 Petition seeking prior approval of the Commission for Advance & Return Energy Banking to M/s Haryana Power Purchase Centre under an Energy Banking Agreement with Uttarakhand Power Corporation Ltd. 22-11-2024
27 Petition seeking approval of capital investment on Rehabilitation works of civil structure of Ichari Dam under Section 61 and 86 of the Electricity Act, 2003 read with the relevant regulations and guidelines of the Commission 21-11-2024
28 Hon’ble APTEL’s Judgement dated 19.07.2024 on Appeal no. 215 of 2016, Appeal No. 283 of 2016 & Appeal No. 139 of 2018 w.r.t. ‘Denial of 50% of the excess IDC and 50% of Price Variation component of capital cost for MB-II project’ 20-11-2024
29 Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2024-25 and onwards till reviewed/revised by the Commission 19-11-2024
30 Petition for fixation of voltage wise distribution loss or reduction of approved distribution loss for open access captive solar power plants under Uttarakhand State Solar Policy-2023. 28-10-2024
31 Application seeking review of the UERC’s Tariff Order on True-up for FY 2022-23, Annual Performance Review for FY 2023-24 and Annual Fixed Charges for FY 2024-25 10-10-2024
32 Application seeking approval of the Commission on the Draft Power Purchase Agreement for short term between Uttarakhand Power Corp. Ltd. and M/s Arunachal Pradesh Power Corporation Pvt. Ltd. (APPCPL) under a Short-Term Power Purchase Agreement with Uttarakhand Power Corporation Ltd 08-10-2024
33 Application seeking approval of the Commission on the Draft Power Purchase Agreement for short term between Uttarakhand Power Corp. Ltd. and M/s Tata Power Trading Company Ltd. (TPTC Ltd.) under a Short-Term Power Purchase Agreement with Uttarakhand Power Corporation Ltd 08-10-2024
34 Petition filed under Regulation 9, 20, 58, 59, 61 and 62 of the UERC (Conduct of Business Regulations), 2014 and Regulations 3.6 and chapter-8 Regulation 1 to 3 of UERC Supply Code Regulation 2020 against wrongful release of individual connections and for clarifying the scope of proviso to sub regulation 6 of regulation 3.6 and removing the difficulty by modifying or amending the provisions regarding releasing of individual connections to user taking supply from the bulk supply connections issued to a developer 07-10-2024
35 Application for Determination of Additional Surcharge in accordance with the provisions of UERC (Terms and Conditions of Intra-State Open Access) Regulations, 2015 to meet the fixed cost of UPCL arising out of its obligation to supply electricity to the Open Access Consumers 30-09-2024
36 Application seeking removal of difficulty/clarification in the UERC (The Electricity Supply Code, Release of New Connections and Related Matters) Regulations, 2020 23-09-2024
37 Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s JGN Sugar and Biofuels Pvt. Ltd 19-09-2024
38 Review Petition to relax/waive or vary the provisions of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007 and UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2013 and UERC (The Electricity Supply Code, Release of New connections and Related Matters)Regulations, 2020 whereby the penalty was imposed in the matter of delay in release of new LT service connections for the period of F.Y. 2008-09 to F.Y. 2018-19 and up to Feb-2020 and from Sept-2021 to April-2024 18-09-2024
39 Investment Approval for Augmentation of 220 kV substation Jhajra (2x160 MVA to 3x160 MVA T/F at 220/132 kV voltage level and 2x80 MVA to 3x80 MVA at 132/33 kV voltage level) 17-09-2024
40 Application seeking approval of the Fuel and Power Purchase Cost Adjustment (FPPCA) charged from/refunded to the consumers against the incremental power purchase cost for the quarter ending March, 2024. 10-09-2024
41 Application seeking approval for the investment on the project for “Installation of Automatic Reactive Power Solution (Capacitor Bank) on 33/11 kV Substations in the State of Uttarakhand. 02-09-2024
42 Investment Approval for Construction of proposed 220/132/33 kV S/s Raipur (Bhagwanpur), Roorkee along with construction of associated lines (220 kV D/c Line from 400 kV substation, Puhana (PCGIL), Roorkee to proposed 220/132/33 kV S/s Raipur (Bhagwanpur), Roorkee & LILO Line of 132 kV Bhagwanpur-LSM line at proposed 220/132/33 kV S/s Raipur, Bhagwanpur, Roorkee). 02-09-2024
43 Investment Approval of: I. Construction of 220/132/33 kV GIS substation Banbasa, Tanakpur. II. Construction of LILO of 220 kV Tanakpur-CB Ganj Line at proposed 220 kV Substation Banbasa, Tanakpur. III. Construction of 132 kV D/C transmission line from 132 kV S/s KhatimaII to proposed 220 kV S/s Banbasa, Tanakpur. IV. Construction of 132 kV D/C line from proposed 220 kV S/s Banbasa, Tanakpur to proposed 132 kV S/s Lohaghat. 16-08-2024
44 Investment Approval for Procurement 01 Set of Emergency Restoration System (ERS) for Transmission Lines of PTCUL 14-08-2024
45 Petition filed under Section 86 of Electricity Act 2003, Regulation 45 of Uttarakhand Electricity Regulatory Commission (Conduct of Business) Regulations, 2014 and keeping in view relevant provisions of Uttarakhand Electricity Regulatory Commission (MYT) Regulations 2021 for “Compensation for Delayed Payment of Invoices” for power supplied to Uttarakhand Power Corporation Limited (UPCL) from 107 MW of 225 MW Gas Based Combined Cycle Power Plant, Kashipur. 30-07-2024
46 Power Purchase Agreement dated 18.02.2021 executed between Bhilangana Hydro Power Ltd. and Uttarakhand Power Corporation Ltd. seeking appropriate direction for release of outstanding payment alongwith applicable Late Payment Surcharge towards the power supplied by BHPL to UPCL during the FY 2020-21 22-07-2024
47 Petition for resolution of matter pertaining to “Compensation for Delayed Payment of Invoices” for power supplied to Uttarakhand Power Corporation Limited (UPCL) from 214 MW (225 MW) ISO for Phase I of 2x225 MW (450 MW ISO) Gas Based Combined Cycle Power Plant at Kashipur, Uttarakhand, of M/s Sravanthi Energy Private Limited for the FY 2018-19, FY 2019-20, FY 2020- 21, FY 2021-22, FY 2022-23 and for the period 1st April 2023 to 31st August 2023. 12-07-2024
48 Tariff Order dated March 28, 2024 (Petition No. 52 of 2023) in the matter of Tariff Petition filed by M/s Greenko Budhil Hydro Power Pvt. Ltd. for ARR for FY 2024-25 alongwith True Up of FY 2022-23 and Annual Performance Review for FY 2023-24 29-05-2024
49 Petition for seeking prior approval of capital investment on Rehabilitation Works of Virbhadra Barrage & Power Channel of Chilla Hydro Electric Project 17-05-2024
50 Suo-moto proceedings in the matter of Supplementary PPA for revised payment terms for release of gas payments. 03-05-2024
Officers Contact
S. No. Name Designation Phone
1Sh. M. L. PrasadChairman2643755
2Sh. Anurag SharmaMember-Law2642179
3Sh. Prabhat Kishor DimriMember-Technical2641133
4Sh. Neeraj SatiSecretary2643799
5Sh. Gaurav SharmaDirector (Costing/Licensing)2641747
6Sh. Radhyshyam BelwalDy. Director (Accounts)2643955
7Sh. Gaurav LohaniAssistant Director (Tariff)2643955
8Sh. Abhishek PandeyDy. Director (Technical)2643944
9Sh. Yashwardhan DimriDirector (Technical)2641115
10Sh. Mukesh C. VermaDy. Director (IT)2641119
11Sh. Shivanku BhattAssistant Director (Law)2641115
12Sh. Deepak KumarDy. Director (Administration)2641119
13Sh. Deepak PandeyDirector (Finance)2641113
14Sh. Gaurav SabharwalJoint Director (Finance/Tariff)2641747
15Sh. Praveen KumarAccounts Officer2643955
16Sh. Vineet MallAssistant Director (Costing/Licensing)2641115
Go to Top