Department of Management Sciences (DoMS) Indian Institute of Technology Kanpur

Click Here for 3rd Regulatory Manthan on “Draft Electricity (Amendment) Bill, 2025” (Online)

close
About RERC

On 25th September 1995, Rajasthan Power Sector Reforms Bill (Reform Bill) was approved by the legislative Assembly of Rajasthan. This bill became effective from June 1, 2000 after it got the Presidential Assent on Dec 28,1999. Afterwards, Rajasthan Electricity Regulatory Commission (RERC) was established in January 2000.

The Commission consists of a Honourable Chairperson, 2 Members, Secretary, along with Directors, Deputy Directors and Assistant Directors of respective fields.

Organisation

On 19th July 2000, erstwhile power utility RSEB unbundled into following new entities:

  • Rajasthan RajyaVidyutUtpadan Nigam Limited(RVUN), to operate and maintain the existing state owned power stations
  • Rajasthan RajyaVidyutPrasaran Nigam Limited (RVPN), to undertake the function of transmission and bulk supply of electricity in Rajasthan and also own the rights in shared inter-state partnership projects.
  • The distribution function was separated from RSEB and bifurcated into three Distribution Companies, registered under the Companies Act namely, JaipurVidyutVitran Nigam Limited, Ajmer VidyutVitran Nigam Limited and Jodhpur VidyutVitran Nigam Limited
RERC Snapshot of power sector
Installed Capacity (As on 31-Aug-2025)
State Ownership Technology wise breakup (MW) Grand Total
Thermal Nuclear Renewable
Coal Lignite Gas Diesel Total Hydro RES(MNRE)
Rajasthan
State 7580 250 603.5 0 8433.5 0 433 23.85 8890.35
Private 3257 1080 0 0 4337 0 104 34121.97 38562.97
Central 1786.7 250 171.13 0 2207.82 806.74 1568.67 4457.59 9040.82
Sub-Total 12623.7 1580 774.63 0 14978.32 806.74 2105.67 38603.41 56494.14

Link- https://cea.nic.in/wp-content/uploads/installed/2023/04/IC_April_2023.pdf

Generating units (As on 31.03.2023)
Name of Utility/Power Station Utility Ownership Type Energy Source Installed Capacity (MW)
Rajasthan (Rawatb Hata Atomic Power Station) A.P.S. 2,3,4 NPCIL Central Nuclear-Nuclear 640
Anta NTPC Ltd. Central Thermal-Gas 419
JSW Energy (Barmer) Ltd/Raj Westpower Ltd. Rajasthan JSW Energy Ltd. Private Thermal-Lignite 1080
Rajasthan(Rawatb Hata Atomic Power Station) A.P.S. 5 & 6 NPCIL Central Nuclear-Nuclear 440
Kota Super Thermal RRVUNL State Thermal-Coal 1240
Suratgarh TPS RRVUNL State Thermal-Coal 1500
Suratgarh STPS RRVUNL State Thermal-Coal 660
Chhabra TPP 1,2,3 & 4 RRVUNL State Thermal-Coal 1000
Ramgarh GT Power RRVUNL State Thermal-Gas 271
CSCTPP Unit 5 & 6 RRVUNL State Thermal-Coal 1320
Dholpur Gas TPS RRVUNL State Thermal-Gas 330
Mahi Hydel Power RRVUNL State Hydro 140
Mini Micro Hydel RRVUNL State Hydro 24
Kalisindh TPP 1 & 2 RRVUNL State Thermal-Coal 1200
Adani Power Rajasthan Ltd (1200 MW PPA Rajasthan Discom) Adani Power Ltd. Private Thermal-Coal 1320
Neyveli Barsingsar Neyveli Lig. Corp. Ltd. Private Thermal-Lignite 250

Link- https://cea.nic.in/wp-content/uploads/executive/2023/04/Executive_Summary_Mar_2023_merged.pdf

Rajasthan Energy Sale (MU) Approved 2023-24 :-
Sr. No. Consumer Category JVVNL AVVNL JDVVNL Total
1 Domestic 8044 5931 5473 19448
2 Non-Domestic 2870 1687 1657 6214
3 Public Street Light 194 108 94 396
4 Agriculture (Metered) 11084 7576 17149 35810
5 Agriculture (Flat) 98 0 952 1050
6 Small Industry 453 300 236 989
7 Medium Industry 922 885 756 2564
8 Large Industry 8733 8976 3199 20908
9 Public Water Works (S) 438 412 367 1217
10 Public Water Works (M) 49 37 106 192
11 Public Water Works (L) 434 428 769 1631
12 Mixed Load / Bulk Supply 236 118 423 777
13 Electric Traction 0 25 28 53
14 EV 2 0 0 2
15 Total 33559 26483 31209 91251

Link- https://rerc.rajasthan.gov.in/rerc-user-files/tariff-orders

Breakup of RE (MW) (As on 30.04.2023)
States / UTs Small Hydro Wind BM Cogen. (Bagasse) BM Cogen. (Non- Bagasse) Waste to Energy Waste to Energy (Off-grid) Ground-Mounted Solar Rooftop Solar Hybrid Solar Off-grid Solar Total Capacity
Rajasthan 23.85 5193.42 119.25 2 - 3.83 14076 918 1579 570 22485

Link- https://mnre.gov.in/img/documents/uploads/file_s-1683779844352.pdf

Average Cost of Supply (ACoS) (Rs./ kWh)
Sr. No. DISCOMs 2023-24
1 JVVNL 8.08
2 AVVNL 7.60
3 JdVVNL 7.94

Link- https://rerc.rajasthan.gov.in/rerc-user-files/tariff-orders

Latest Documents
S. No. Title Date
1 RERC (Terms and Conditions for Green Energy Open Access) Regulations, 2025 21-05-2025
2 RERC (Terms and Conditions for Determination of Tariff) Regulations, 2025 06-03-2025
3 RERC (Rajasthan Electricity Grid Code) Regulations, 2024 29-01-2025
4 RERC (Terms and Conditions for Determination of Tariff) Regulations, 04-12-2024
5 RERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024 [Draft] 01-10-2024
6 Draft Rajasthan Electricity Regulatory Commission (Grid Interactive Distributed Renewable Energy Generating Systems) (Second Amendment) Regulations, 2024 05-07-2024
7 RERC (Grid Interactive Distributed Renewable Energy Generating Systems) (Second Amendment) Regulations), 2024 [Draft] 05-07-2024
8 RERC (Renewable Purchase Obligation) Regulations, 2023 13-06-2024
9 RERC (Renewable Purchase Obligatio), Regulation 2023 13-06-2023
10 RERC (Grid Interactive Distributed Renewable Energy Generating Systems) (First Amendment) Regulations, 2023 [Draft] 30-05-2023
11 RERC(Electricity Supply Code and Connected Matters) (First Amendment), Regulations, 2023 20-04-2023
12 RERC (Electricity supply code and connected matters) (First Amendment), Regulation, 2023 20-04-2023
13 RERC (Terms and Conditions for Determination of Tariff) (Second Amendment) Regulations, 2023 27-01-2023
14 Draft RERC (Renewable Purchase Obligation) Regulations, 2023 01-01-2023
15 RERC (Electricity Supply Code and Connected Matters)(First Amendment), Regulations, 2022 [Draft] 01-07-2022
16 RERC (Renewable Energy Obligation) (7th Amd) Regulations, 2021 14-12-2021
17 TERC (Renewable Energy Obligation) (Seventh Amendment) Regulations ,2021 [SOR] 14-12-2021
18 RERC (Grid Interactive Distributed Renewable Energy Generating Systems) Regulations, 2021 08-04-2021
19 RERC (Consumer Grievance Redressal Forum, Electricity Ombudsman and Consumer Advocacy) Regulations, 2021 05-04-2021
20 RERC (Standards of Performance for Distribution Licensees) Regulations, 2021 31-03-2021
21 RERC (Transaction of Business) Regulations, 2021 17-02-2021
22 RERC (Electricity Supply Code and Connected Matters) Regulations, 2021 17-02-2021
23 RERC (Transaction of Business) Regulations, 2021 17-02-2021
24 RERC (Standards of Performance of Transmission Licensee) Regulations, 2021 03-02-2021
25 RERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020 02-11-2020
26 RERC (Service) (6th Amd) Regulations, 2020 11-05-2020
27 RERC (Grid Interactive Distributed Renewable Energy Generating Systems) Regulations, 2020 [Draft] 30-03-2020
28 RERC (Terms and Conditions for Determination of Tariff) (1st Amd) Regulations, 2020 28-02-2020
29 RERC (Renewable Energy Obligation) (6th Amd) Regulations, 2020 04-02-2020
30 RERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) (1st Amd) Regulations, 2020 28-01-2020
31 RERC (Settlement of Disputes by Electricity Ombudsman) (2nd Amd) Regulations, 2020 22-01-2020
32 RERC (Terms and Conditions for Determination of Tariff) Regulations, 2019 10-05-2019
33 RERC (Connectivity and Net Metering for Rooftop and Small Solar Grid Interactive Systems) (1st Amd) Regulations, 2019 05-03-2019
34 RERC (Deviation Settlement Mechanism and related matters) (1st Amd) Regulations, 2019 05-03-2019
35 RERC (Terms and Conditions for Determination of Tariff for Renewable Energy Sources- Biomass, Biogas and Biomass Gasifier Energy) (1st Amd) Regulations, 2019 05-03-2019
36 RERC (Terms and Conditions for determination of tariff for Renewable Energy Sources-Wind and Solar Energy) (2nd Amd) Regulations, 2019 05-03-2019
37 RERC (Renewable Energy Certificate and Renewable Purchase Obligation Compliance Framework) (3rd Amd) Regulations, 2019 05-03-2019
38 RERC (Service) (5th Amd) Regulations, 2019 14-02-2019
39 RERC (Power Purchase and Procurement Process of Distribution Licensees) (5th Amd) Regulations, 2019 11-01-2019
40 RERC (Renewable Energy Obligation) (5th Amd) Regulations, 2019 11-01-2019
41 RERC (Fee) Regulations, 2018 31-12-2018
42 RERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2017 08-11-2017
43 RERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2017 14-09-2017
44 RERC (Power Purchase and Procurement Process of Distribution Licensees) (4th Amd) Regulations, 2017 07-06-2017
45 RERC (Renewable Energy Certificate and Renewable Purchase Obligation Compliance Framework) (2nd Amd) Regulations, 2017 07-06-2017
46 RERC (Renewable Energy Obligation) (4th Amd) Regulations, 2017 07-06-2017
47 RERC (Renewable Energy Certificate and Renewable Purchase Obligation Compliance Framework) (1st Amd) Regulations, 2016 15-03-2016
48 RERC (Terms and Conditions for Open Access) Regulations, 2016 27-01-2016
49 RERC (Transmission Licensee’s Standards of Performance) (2nd Amd) Regulations, 2016 19-01-2016
50 RERC (Terms and Conditions for Determination of Tariff for Renewable Energy Sources - Biomass, Biogas and Biomass Gasifier Energy) Regulations, 2015 07-05-2015
Latest Documents
S. No. Title Date
1 RERC Tariff order(In the matter of Petition filed under section 63 (Determination of tariff by bidding process) of the Electricity Act 2003, read with regulation 19 and 21 of RERC (Transaction of Business), Regulations, 2021, for approval of levelized tariff discovered through transparent competitive bidding carried out by JVVNL for solar power projects with aggregate capacity of 12.02 MW under under Component-C (Feeder Level Solarization) of PM-Kusum Scheme vide TN-09,2025 02-04-2025
2 RERC Tariff order on (Petition for approval of pre-fixed levelized tariff for solar power capacity of 5,000 MW available for implementation under component A of PM-KUSUM scheme in Rajasthan Discoms), 2025 12-03-2025
3 RERC Load Despatch Centre Regulation, 2024 27-11-2024
4 RERC, Additional capital expenditure Tariff ,2024 30-10-2024
5 RERC Determination of tariff by bidding process, 2024 11-09-2024
6 Petition for seeking approval of procurement of 500 MW Solar Power from SJVN Green Energy Ltd., under the Central Public Sector Undertaking (CPSU) Scheme of the Ministry of New and Renewable Energy 24-07-2024
7 Petition seeking approval of procurement of 300 MW Solar Power from NLC India Ltd., under the Central Public Sector Undertaking (CPSU) scheme of the Ministry of New and Renewable Energy 24-07-2024
8 Petition for In-principle approval under section 86(1)(a) and 61 of Electricity Act, 2003 read with Regulation 24(3) of RERC Tariff Regulations, 2019 and other power enabling in this behalf for allowing additional expenditure for disposal of Ash from RVUN power plants in pursuant to the MoEF & CC, GoI Notifications dated 25.01.2016 & 31.12.2021 and amendments under change in law 19-07-2024
9 Petition for removal of difficulty under section 11, 61,62 & 86(1)(a) of Electricity Act, 2003 read with Regulation 95 of RERC Tariff Regulations, 2019 and other powers enabling it in this behalf for allowing Interim Energy Charges Rate (ECR) for DCCPP 18-07-2024
10 Petition filed in the matter of seeking approval of procurement of 1000 MW Solar Power from Respondents as per guidelines issued by Ministry of New and Renewable Energy. 10-07-2024
11 Petition filed under Section 62 (4) of the Electricity Act, 2003 read with Regulation 88 of RERC (Terms and Conditions for Determination of Tariff) Regulations, 2019 to recognize Additional Power Purchase Cost incurred in order to comply with the orders of Hon’ble Supreme Court in the matter of change in law and allow recovery of additional power purchase cost through special FSA 01-07-2024
12 Petition filed under Section 86(1)(b) of the Electricity Act , 2003 for approval of amendment in the original PPA and adoption and approval of the Tariff of 50 percent of generation to be now sold to petitioners by virtue of amendment in the PPA 20-06-2024
13 Petition filed under section 63 (Determination of Tariff by Bidding Process) of the Electricity Act 2003, read with Regulation 19 and 21 Of RERC (Transaction of Business), Regulations, 2021, for approval of Levelized Tariff Discovered through Transparent Competitive Bidding carried out by AVVNL For solar power projects under Component-C (Feeder Level Solarization) of PM-KUSUM Scheme Under TN-DSM-07 31-05-2024
14 Petition under Section 63 and 86 (1)(b) of the Electricity Act, 2003 and all other powers enabling it in this behalf for Adoption of Tariff for 900 MW Solar Power Project to be installed by Coal India Limited in RVUN?s 2000 MW Solar Park on the same Term and Condition as discovered through tariff-based competitive bidding process for RVUN 810 MW Solar Power Project under RE bundling Scheme. 15-05-2024
15 Petition filed under section 63 (Determination of tariff by bidding process) of the Electricity Act 2003, read with regulation 19 and 21 of RERC (Transaction of Business), Regulations, 2021, for approval of levelized tariff discovered through transparent competitive bidding carried out by JdVVNL for solar power projects under Component-C (Feeder Level Solarization) of Pm-Kusum Scheme 01-04-2024
16 RERC (True up of ARR of FY 2021-22 for KTPS (Units 1-7), STPS (Units 1-6), CTPP (Units 1-4), KaTPP (Units 1-2), CSCTPP (Units 5&6), RGTPS (270.50 MW), Mahi Hydel and approval of Aggregate Revenue Requirement (ARR) & Tariff for FY 2023- 24 for KTPS (Units 1-7), STPS (Units 1-6), CTPP (Units 1-4), KaTPP (Units 1-2), CSCTPP (Units 5&6), RGTPS (270.50 MW) and Mahi Hydel Power Stations of Rajasthan Rajya Vidyut Utpadan Nigam Ltd), 2023 12-05-2023
17 RERC (True up for FY 2021-22 and Annual Revenue requirement & SLDC Charges for FY 2023-24 of State Load Despatch Centre(SLDC)), 2023 03-05-2023
18 RERC (True up for FY 2021-22 and Aggregate Revenue Requirement, Tariff and Investment Plan for FY 2023-24), 2023 31-03-2023
19 RERC (True up for FY 2021-22 and Aggregate Revenue Requirement, Tariff and Investment Plan for FY 2023-24), 2023 31-03-2023
20 RERC (True up for FY 2021-22 and Aggregate Revenue Requirement, Tariff and Investment Plan for FY 2023-24), 2023 31-03-2023
21 RERC (True up of Aggregate Revenue Requirement for FY 2018-19 to FY 2020-21 for Chhabra Super Critical Thermal Power Project (CSCTPP) (Units 5 & 6)of Rajasthan Rajya Vidyut Utpadan Nigam Ltd), 2022 02-12-2022
22 RERC (True up of Aggregate Revenue Requirement for FY 2018-19 to FY 2020-21 for Chhabra Super Critical Thermal Power Project (CSCTPP) (Units 5 and 6)of Rajasthan Rajya Vidyut Utpadan Nigam Ltd), 2022 02-12-2022
23 RERC (Approval of Investment Plan for Rajasthan Rajya Vidyut Prasaran Nigam Limited FY 2022-23), 2022 01-12-2022
24 RERC In the matter of Petition for review of Commission?s Order dated 23.06.2022 passed in the Petition No. 1985/2022 for determination of ARR and Tariff for CSCTPP unit 5&6 for FY 2022-23. 01-12-2022
25 RERC (Aggregate Revenue Requirement, Tariff Petition and Investment Plan FY 2022-23), 2022 01-09-2022
26 RERC (Aggregate Revenue Requirement, Tariff Petition and Investment Plan FY 2022-23), 2022 01-09-2022
27 RERC Tariff Order for (JVVNL, AVVNL, JdVVNL) True-up (FY 21) 14-07-2022
28 RERC (Approval of true up for FY 2020-21), 2022 14-07-2022
29 RERC (True up of Jaipur Vidyut Vitran Nigam Ltd (JVVNL), Ajmer Vidyut Vitran Nigam Ltd (AVVNL) and Jodhpur Vidyut Vitran Nigam Ltd (JdVVNL)for FY 2020-21), 2022 14-07-2022
30 RERC Tariff Order for (SLDC) True-up (FY 21), ARR & Tariff (FY 23) 13-07-2022
31 RERC (True up for FY 2020-21 and Annual Revenue requirement & Tariff for FY 2022-23 of Transmission and SLDC ), 2022 13-07-2022
32 RERC (True up of ARR of FY 2020-21 for KTPS (Units 1-7), STPS (Units 1-6), CTPP (Units 1-4), KaTPP (Units 1-2), RGTPS (270.50 MW), Mahi Hydel and approval of Aggregate Revenue Requirement (ARR) & Tariff for FY 2022-23 for KTPS (Units 1-7), STPS (Units 1-6), CTPP (Units 1-4), KaTPP (Units 1-2), RGTPS (270.50 MW) and Mahi Hydel Power Stations of Rajasthan Rajya Vidyut Utpadan Nigam Ltd.), 2022 23-06-2022
33 RERC Tariff Order for (RRVUNL) True-up (FY 21), ARR & Tariff (FY 23) 02-05-2022
34 RERC (Tariff Order for (CSCTPP (Units 5&6)) Final Capital Cost, ARR & Tariff (FY 19 to FY 22)), 2021 28-12-2021
35 RERC (Tariff Order for (RRVPNL) True-up (FY 20), ARR & Tariff (FY 22)), 2021 23-12-2021
36 RERC (Tariff Order for (RVPNL) True-up (FY 20), ARR & Tariff (FY 22)), 2021 23-12-2021
37 RERC (Tariff Order for (JVVNL, JdVVNL, AVVNL) ARR (FY 21 to FY 24)), 2021 24-11-2021
38 RERC (Tariff Order for (JVVNL, AVVNL, JdVVNL) Investment Plan, ARR & Tariff (FY 21 to FY 24)), 2021 24-11-2021
39 RERC (Tariff Order for (DCCPP) ARR & Tariff (FY 21)), 2021 22-11-2021
40 RERC (Tariff Order for (RRVPNL) Investment Plan (FY 22)), 2021 22-11-2021
41 RERC (Tariff Order for (KaTPP (Units 1 and 2)) APR (FY 15 to FY 20), ARR & Tariff (FY 22)), 2021 04-10-2021
42 RERC (Tariff Order for (JVVNL, AVVNL, JdVVNL) True-up (FY 20)), 2021 07-09-2021
43 RERC (Tariff Order for (JVVNL, JdVVNL, AVVNL) True-up (FY 20)), 2021 07-08-2021
44 RERC (Generic Tariff Order for (Biomass, Biogas and Biomass Gasifier Power Plants) (FY 21 & FY 22)), 2021 23-03-2021
45 RERC (Tariff Order for (SSCTPS (Units 7&8)) ARR & Tariff (FY 20 & FY 21)), 2021 03-02-2021
46 RERC (Tariff Order for (JVVNL, JdVVNL, AVVNL) True-up (FY 19)), 2021 27-01-2021
47 RERC (Tariff Order for (JVVNL, AVVNL, JdVVNL) True-up (FY 19)), 2021 27-01-2021
48 RERC Tariff Order for (RRVPNL) True-up (FY 19), ARR & Tariff (FY 21) 12-10-2020
49 RERC Tariff Order for (RVPNL) True-up (FY 19), ARR & Tariff (FY 21) 12-10-2020
50 RERC Tariff Order for (RRVPNL) Add. Exp. (FY 19) 11-09-2020
Officers Contact
Commission and Secretary
Sr. No. Name Designation Telephone Number
1 Dr. B. N. Sharma Chairman 2742337
2 Sh. Hemant Kumar Jain Member 2741091
3 Dr. Rajesh Sharma Member 2741106
4 NA Secretary 2740067
5 Sh. Himanshu Khurana Director (Tech.) 2742473
6 Sh. Tarun Mathur Director (Tech.) 2741410
7 Sh. B.L. Gupta Director(Fin.) 2741463
8 Sh. Dinesh Khandelwal Joint Director (Tech.) 2741299
9 Sh. Pawan Sut Sharma Joint Director (Tech.) 2741299
10 Sh. P.K. Garg Deputy Director (Tech.) 2741299
11 NA Deputy Director (Tech.) 2741299
12 Sh. Ghan Shyam Verma Deputy Director (Tech.) 2741299
13 NA Deputy Director (Fin.) 2741299
14 Sh. Ashok Agarwal Deputy Director (Tech.) 2741299
15 NA Deputy Director (Admn) 2741299
16 Vacant Deputy Director 2741106
17 Sh. Anand Soni Assistant Director (Tech.) 2741299
18 Sh. Amit Dubey Assistant Director (Tech.) 2741299
19 Sh. Paresh Gaur Assistant Director (Tech.) 2741299
20 Sh. Suresh Chand Gupta Assistant Director (Tech.) 2741299
21 Sh. Nagendra Jha Assistant Director (Tech.) 2741299
22 Sh. Anil Kumar Kedawat Assistant Director (Fin.) 2741299
23 Ms. Neha Lakhani Assistant Director (Fin.) 2741299
Go to Top