About RERC

On 25th September 1995, Rajasthan Power Sector Reforms Bill (Reform Bill) was approved by the legislative Assembly of Rajasthan. This bill became effective from June 1, 2000 after it got the Presidential Assent on Dec 28,1999. Afterwards, Rajasthan Electricity Regulatory Commission (RERC) was established in January 2000.

The Commission consists of a Honourable Chairperson, 2 Members, Secretary, along with Directors, Deputy Directors and Assistant Directors of respective fields.

Organisation

On 19th July 2000, erstwhile power utility RSEB unbundled into following new entities:

  • Rajasthan RajyaVidyutUtpadan Nigam Limited(RVUN), to operate and maintain the existing state owned power stations
  • Rajasthan RajyaVidyutPrasaran Nigam Limited (RVPN), to undertake the function of transmission and bulk supply of electricity in Rajasthan and also own the rights in shared inter-state partnership projects.
  • The distribution function was separated from RSEB and bifurcated into three Distribution Companies, registered under the Companies Act namely, JaipurVidyutVitran Nigam Limited, Ajmer VidyutVitran Nigam Limited and Jodhpur VidyutVitran Nigam Limited
RERC Snapshot of power sector
Installed Capacity -

The sectorwise and resource-wise share of installed capacity in the state of Rajasthan, as on 31-Jan-2022, is given below -

Mode wise breakup
Thermal Renewable
State Ownership/ Sector Coal Lignite Gas Diesel Total Nuclear Hydro RES(MNRE) Total Grant Total
Rajasthan
State 7580.00 250.00 603.80 0.00 8433.80 0.00 433.00 23.85 456.85 8890.65
Private 2957.00 1080.00 0.00 0.00 4037.00 0.00 104.00 13620.49 13724.49 17761.49
Central 1062.59 250.00 221.00 0.00 1533.69 556.74 1402.19 344.00 1746.19 3836.62
Sub - Total 11599.59 1580.00 824.90 0.00 14004.49 556.74 1939.19 13988.34 15927.53 30488.76
Share of Renewables -

Breakup of RE in Rajasthan has been provided in the following table. All these values are in MW, and as on 31 January, 2022.

Small Hydro Power Wind Power Bio-Power Solar Power Total Capacity
23.85 4326.82 125.08 9512.59 13988.34
Energy Sale (MU) Approved FY 2021-22 -
S.No. Particulars JVVNL AVVNL JdVVNL Total
1 Domestic 6397 4839 4317 15553
2 Non Domestic 2519 1326 1296 5141
3 Public Street Light 181 91 101 373
4 Agriculture 9235 6489 12941 28665
5 Small Industry 314 288 217 819
6 Medium Industry 821 858 680 2359
7 Large Industry 6039 4034 1560 11633
8 Public Water Works 916 816 1113 2845
9 Mixed Load / Bulk Supply 163 92 356 611
10 Total 26585 18833 22581 67999
Average Cost of Supply (ACOS) -
S. No. Utilities FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22
1 JVVNL 7.04 7.52 7.4 6.97 7.92 - -
2 AVVNL 7.64 7.62 7.33 7.17 8.08 - -
3 JdVVNL 6.86 6.88 6.97 6.95 8.14 - -
Latest Documents
S. No. Reg No. Date Name of the Regulations
(dates of subsequent amendments are given in bracket)
1 144 08/04/2021 RERC (Grid Interactive Distributed Renewable Energy Generating Systems) Regulations, 2021
2 143 05/04/2021 RERC (Consumer Grievance Redressal Forum, Electricity Ombudsman and Consumer Advocacy) Regulations, 2021
3 142 17/02/2021 RERC (Transaction of Business) Regulations, 2021
4 141 31/03/2021 RERC ( Standards of Performance for Distribution Licensees) Regulations, 2021
5 140 03/02/2021 RERC (Standards of Performance of Transmission Licensee) Regulations, 2021
6 139 17/02/2021 RERC (Electricity Supply Code and Connected Matters) Regulations, 2021
7 138 02/11/2020 RERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020
Orders
S. No. Petition No Party Name Subject Order Date
1 1879/2021 Rajasthan Vidyut Utpadan Nigam Ltd. Determination of Final Capital Cost and Aggregate Revenue Requirement (ARR) and Tariff for FY 2018-19 to FY 2021-22 for Chhabra Super Critical Thermal Power Project (CSCTPP) (Units 5 and 6) 28/12/2021
2 1875/2021 Rajasthan Rajya Vidyut Prasaran Nigam Ltd. Approval of true up for FY 2019-20 and Annual Revenue Requirement and Tariff for FY 2021-22 of Transmission and SLDC 23/12/2021
3 1872/2021 Rajasthan Vidyut Utpadan Nigam Ltd. In the matter of Truing up of ARR FY 2019-20 and ARR and Tariff for FY 2021-22 15/12/2021
4 1841/2020, 1842/2020, 1843/2020, 1627/2020, 1625/2020, 1626/2020, 1596/2019, 1799/19 Discoms In the matter of approval of Multi Year Aggregate Revenue Requirement, Tariff Petition and investment plan of Jaipur Vidyut Vitran Nigam Ltd. (JVVNL), Ajmer Vidyut Vitran Nigam Ltd. (AVVNL) and Jodhpur Vidyut Vitran Nigam Ltd. (JdVVNL) for FY 2020-21 to FY 2023-24. 24/11/2021
5 1878/2021 Rajasthan Vidyut Utpadan Nigam Ltd. Determination of Annual Revenue Requirement (ARR) and Tariff for FY 2020-21 for Dholpur Combined Cycle Power Plant (DCCPP) 22/11/2021
6 1852/2020 Rajasthan Rajya Vidyut Prasaran Nigam Ltd. Approval of Investment Plan FY 2021-22 22/11/2021
7 1479/2019 M/s Rollz Material Handling Systems Pvt. Ltd. In the matter of determination of project specific tariff of Municipal Solid Waste to Energy plant under Section 62 and 86 of the Electricity Act, 2003. 21/10/2021
8 1760/2020 Sh. Mohan Lal Prajapat Petition filed for review of Commissions order dated 06.02.2020 passed in the matter of determination of ARR and tariff of JVVNL, AVVNL and JdVVNL for FY 2019 20 04/10/2021
9 1880/2021 Rajasthan Vidyut Utpadan Nigam Ltd. Approval of true-up of ARR for FY 2014-15 to FY 2019-20 and determination of ARR and tariff for FY 2021-22 KaTPP Unit 1 and 2 04/10/2021
10 1844/2020, 1862/2020, 1847/2020 JVVNL AVVNL JdVVNL Approval of true up for FY 2019-20 07/09/2021
11 1876/2021 Rajasthan Rajya Vidyut Prasaran Nigam Ltd Review of Commission Order dated 12.10.2020 23/07/2021
12 1854/2020 Rajasthan Rajya Vidyut Prasaran Nigam Ltd. Review of Commission Order dated 08.10.2020 14/07/2021
13 593/2016 Barmer Lignite Mining Company Limited In the matter of determination of transfer price of lignite from Kapurdi and Jalipa mines for FY 2012 to FY 2020 26/03/2021
14 1881/2021 Suo Motu Determination of Generic Tariff for sale of electricity from Biomass, Biogas and Biomass Gasifier based power plants getting commissioned in the State during FY 2020-21 and FY 2021-22 23/03/2021
15 1818/2020 Rajasthan Vidyut Utpadan Nigam Ltd. Review of Commission Order dated 11.09.2020 22/03/2021
16 1665/2020 Sh. D.P. Chirania and Ors. In the matter of review of Commission order dated 06.02.2020 03/03/2021
17 1612/2020 Rajasthan Vidyut Utpadan Nigam Ltd. Determination of Provisional Capital Cost,ARR and Provisional Tariff for Units 7and 8 of Suratgarh Super Critical Thermal Power Station for FY 2019-20 and FY 2020-21 03/02/2021
18 1599/2020 Jaipur Vidyut Vitran Nigam Ltd. Approval of True-up of ARR for FY 2018-19 27/01/2021
19 1600/2020 Ajmer Vidyut Vitran Nigam Ltd. Approval of True-up of ARR for FY 2018-19 27/01/2021
20 1613/2020 Jodhpur Vidyut Vitran Nigam Ltd. Approval of True-up of ARR for FY 2018-19 27/01/2021
21 1744/2020 Rajasthan Rajya Vidyut Utpadan Nigam Ltd. Review of Commission Order dated 12.05.2020 passed in the Petition No. 1515/19 18/01/2021
Officers Contact
S. No. Name Designation Contact us (Office) Contact us (Residence)
1 Dr. B. N. Sharma Chairman 2742337 -
2 Sh. S.C. Dinkar Member 2741106 2357697
3 Sh. Prithvi Raj Member 2741091 -
4 Sh. B.K. Dosi Secretary 2740067 -
5 Sh. Tarun Mathur Director (Tech.) 9001069827 2593928
6 Sh. Himanshu Khurana Director (Tech.) 9829500490 2620679
7 Sh. B.L. Gupta Director(Fin.) 9928143323 3144755
8 Sh. D.K. mathur Deputy Director (Admn) - -
9 Sh. Dinesh Khandelwal Deputy Director (Tech.) 9829099357 -
10 Sh. P.K. Garg Deputy Director (Tech.) - -
Go to Top