About HERC

Haryana Electricity Regulatory Commission was established on 17th August 1998 as an independent statutory body corporate as per the provision of the Haryana Electricity Reform Act, 1997. Haryana was the second State in India to initiate the process of Reform & Restructuring of the Power sector.

The Haryana Electricity Reform Act 1997 (Act No. 10 of 1998) was passed by the Haryana State Legislative Assembly on 22nd of July 1997. It came into force on 14th August 1998 after receiving assent of the President of India on 20th February 1998.

The erstwhile Haryana State Electricity Board was unbundled into two corporate bodies namely Haryana Power Generation Corporation Limited (HPGCL) for the Generation of Power and Haryana Vidyut Prasaran Nigam Limited (HVPNL) for the Transmission & Distribution of power within the state of Haryana. Subsequently, the activity of distribution and retail supply of power was entrusted w.e.f. 1st July 1999, to Uttar Haryana Bijli Vitran Nigam Limited (UHBVNL) for North circles and Dakshin Haryana Bijli Vitran Nigam Limited (DHBVNL) for South circles of Haryana.

The Haryana Electricity Regulatory Commission is a three-member statutory body including the Chairperson with supporting staff, designated to function as an autonomous authority responsible for regulation of the power sector in the state. The State Government on the recommendation of a Selection Committee, set up for the purpose in accordance with section 84 read with the section 85 of the Electricity Act 2003, appoints the Chairperson and Members of the Commission.

HERC Snapshot of power sector
Installed Capacity (As on 31-Aug-2025)
State Ownership Technology wise breakup (MW) Grand Total
Thermal Nuclear Renewable
Coal Lignite Gas Diesel Total Hydro RES(MNRE)
Haryana
State 2510 0 150 0 2660 0 200 69.3 2929.3
Private 4561.78 0 0 0 4561.78 0 539 2542.06 7642.84
Central 1566.6 0 431.59 0 1998.19 123.04 1710.73 5 3836.96
Sub-Total 8638.38 0 581.59 0 9219.97 123.04 2449.73 2616.36 14409.1

Link- https://cea.nic.in/wp-content/uploads/executive/2024/02/Executive_Summary_Feb_2024.pdf

Generating units (As on 29.02.2024)
Name of Utility/Power Station UTILITY Ownership Type Energy Source Installed Capacity (MW)
Panipat TPS - Unit 6 HPGCL State Thermal-Coal 210
Panipat TPS - Unit 7 HPGCL State Thermal-Coal 250
Panipat TPS - Unit 8 HPGCL State Thermal-Coal 250
DCRTPP Unit 1 HPGCL State Thermal-Coal 300
DCRTPP Unit 2 HPGCL State Thermal-Coal 300
RGTPP Unit 1 Hissar HPGCL State Thermal-Coal 600
RGTPP Unit 2 Hissar HPGCL State Thermal-Coal 600
WYC Hydel Station HPGCL State Hydro 62
Indira Gandhi Super Thermal Power Stations, Jhajjar APCPL Private Central 1500
Mahatma Gandhi TPP Jhajjar Power Limited CLP India Pvt. Ltd. (Jhajjar Power Ltd) Private Thermal-Coal 1320
FARIDABAD NTPC LTD. Central THERMAL-GAS 432
FARIDABAD NTPC LTD. Central THERMAL-GAS/RLNG 432

Link- https://cea.nic.in/wp-content/uploads/executive/2024/02/Executive_Summary_Feb_2024.pdf

Energy Sales (MUs) in 2024-25
Sr. No. Consumer Category UHBVNL DHBVNL
1 Domestic 8403.76 10810.47
2 Non Domestic 0 4491.57
3 HT Industrial 9275.13 10180.38
4 LT Industry 3347.24 1297.01
5 Lift Irrigation 0 226.21
6 Agriculture Tube Well Supply 3633.58 5691.36
7 Bulk Supply 449.99 1558.67
8 Railway Traction (incl Metro) 0
9 Streetlight 67.3 92.55
10 PWW 801.2 824.27
11 MITC 0 101.7
Total 25978.47 35293.36

Link- https://herc.gov.in/WriteReadData/Orders/O20240305a(1).pdf

Breakup of RE (MW) (As on 31.03.2024)
States / UTs Small Hydro Wind BM Cogen. (Bagasse) BM Cogen. (Non- Bagasse) Waste to Energy Waste to Energy (Off-grid) Ground-Mounted Solar Rooftop Solar Hybrid Solar Off-grid Solar Total Capacity
Haryana 73.5 0 151.4 111.26 11.2 9.84 265.8 590.67 0 619.25 1832.92

Link- https://cdnbbsr.s3waas.gov.in/s3716e1b8c6cd17b771da77391355749f3/uploads/2024/04/202404091117551894.pdf

Average Cost of Supply (ACoS) (Rs./ kWh)
Sr. No. DISCOMs 2024-25
1 UHBVNL 6.67
2 DHBVNL 5.28

Link- https://herc.gov.in/WriteReadData/Orders/O20240305a(1).pdf

Latest Documents
S. No. Title Date
1 HERC n (Rooftop Solar Grid Interactive Systems Based on Net Metering/Gross Metering) (2nd Amendment) Regulation, 2025 [Draft] 14-08-2025
2 HERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2025 11-02-2025
3 HERC (Green Energy Open Access) Regulations, 2023 (1st Amendment) Regulations, 2025 [Draft] 10-02-2025
4 HERC (Framework for Resource Adequacy) Regulation, 2024 11-11-2024
5 HERC (Terms and Conditions for Determination of Tariff for Generation, trasmission, Wheeling and Distribution, Retail Supply under MYT framework) Regulations, 2024 22-10-2024
6 Haryana Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2024 [Draft] 08-07-2024
7 HERC (Electricity Supply Code) Regulations, 2014 (5th Amendment) Regulations, 2024 13-06-2024
8 HERC (Rooftop Solar Grid Interactive Systems Based on Net Metering/Gross Metering), Regulations, 2021 (1st Amendment) Regulation, 2024 13-06-2024
9 HERC (Electricity Supply Code) (4th Amendment) Regulations, (2023) 15-12-2023
10 HERC (Electricity Supply Code) (3rd Amendment) Regulations, (2023) 15-11-2023
11 HERC Duty to Supply Electricity on Request and Power to Recover Expenditure and Power to Require Security Regulations 2016 (2nd Amendment) Regulation, 2023 [Draft] 15-05-2023
12 HERC (Duty to Supply Electricity on Request and Power to Recover Expenditure and Power to Require Security) Regulations 2016 (3rd Amendment) Regulation, 2023, [Draft] 15-05-2023
13 HERC (Duty to Supply Electricity on Request and Power to Recover Expenditure and Power to Require Security Regulations 2016 (3rd Amendment)) Regulation, 2023, [Draft] 15-05-2023
14 HERC MYT Regulations, 2019), (3rd Amendment) Regulations, 2023. 09-05-2023
15 HERC (Forum and Ombudsman) (2nd Amendment) Regulations, 2023. 09-05-2023
16 HERC (Green Energy Open Access) Regulations, 2023 02-05-2023
17 HERC (Green Energy Open Access) Regulations, 2023 19-04-2023
18 HERC Duty to Supply Electricity on Request and Power to Recover Expenditure and Power to Require Security Regulations 2016 (2nd Amendment) Regulation, 2023 28-02-2023
19 HERC (Forum and Ombudsman) (2nd Amendment) Regulations, 2023, [Draft] 28-02-2023
20 HERC (Green Energy Open Access) Regulations, 2023, [Draft] 27-02-2023
21 HERC (Officers and Employees Conditions of Service) (2nd Amendment) Regulations, 2022 04-01-2023
22 HERC (Prepaid Smart Metering) Regulations, 2022 28-12-2022
23 HERC (Terms and Conditions for determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation and Renewable Energy Certificate) (2nd Amendment) Regulations, 2022 26-12-2022
24 HERC in assessing the Electricity Consumers Satisfaction levels / index in the electricity distribution licensed areas of Uttar Haryana Bijli Vitran Nigam (UHBVNL) and Dakshin Haryana Bijli Vitran Nigam (DHBVNL), [Draft] 04-12-2022
25 HERC (officers and employees conditions of service (2nd amendment) regulation 2022, [Draft] 23-11-2022
26 HERC (Fee) (7th Amendment) Regulations, 2022 09-11-2022
27 HERC (Fee) Regulations, 2005, 7th Amendment Regulations, 2022 25-10-2022
28 HERC (Terms and Conditions for determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation and Renewable Energy Certificate) Regulations, 2021, (2nd Amendment) 2022 25-09-2022
29 HERC (Fee)(6th Amendment) Regulations, 2022 31-08-2022
30 HERC (Prepaid Smart Metering), Regulations, 2022, [Draft] 30-08-2022
31 HERC (Fee) Regulations, 2005, 6 th Amendment Regulations, 2022, [Draf] 04-06-2022
32 HERC(Forum and Ombudsman) (1st Amendment) Regulations, 2022 06-04-2022
33 HERC (Terms and Conditions for determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation and Renewable Energy Certificate) (1st Amd) Regulations, 2022 31-03-2022
34 HERC in assessing the Electricity Consumers Satisfaction levels / index in the electricity distribution licensed areas of Uttar Haryana Bijli Vitran Nigam (UHBVNL) and Dakshin Haryana Bijli Vitran Nigam (DHBVNL), [Draft] 15-03-2022
35 HERC (Terms and Conditions for Determination of Tariff for Generation, Transmission, Wheeling and Distribution & Retail Supply under Multi Year Tariff Framework) Regulations, 2019, 2 nd Amendment Regulations, 2021, [Draft] 01-03-2022
36 HERC (Terms and Conditions) Regulations, 2022 25-02-2022
37 HERC (Forum and Ombudsman) (1st Amendment) Regulations, 2022,[Draft] 16-02-2022
38 HERC (Terms and Conditions for determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation and Renewable Energy Certificate) Regulation, 2021, [draft] 03-02-2022
39 HERC Terms and Conditions for determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation and Renewable Energy Certificate) Regulations, 2021, (1st Amendment) 2022, [Draft] 01-02-2022
40 HERC (Terms and Conditions for Determination of Tariff for Generation, Transmission, Wheeling and Distribution & Retail Supply under MYT Framework) (2nd Amd) Regulations, 2022 31-01-2022
41 HERC Contractual Employees (Terms and Conditions) Regulations, 2022,[Draft] 01-01-2022
42 HERC (OFFICERS AND EMPLOYEES CONDITIONS OF SERVICE) REGULATIONS, 2022,[Draft] 01-01-2022
43 HERC (Terms and Conditions for determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation and Renewable Energy Certificate) Regulations, 2021 01-01-2022
44 HERC (Terms and Conditions for setting up Charging Infrastructure, Tariff and other Regulatory issues for Electric Vehicles) Regulations, 2021 23-12-2021
45 HERC (Consumer Complaint Handling Procedure(CCHP)),2021, [Draft] 14-10-2021
46 HERC (Fee) Regulations, 2005, 5 th Amendment Regulations, 2021, [Draft] 25-07-2021
47 HERC (Rooftop Solar Grid Interactive Systems Based on Net Metering-Gross Metering) Regulations, 2021 19-07-2021
48 HERC (Conditions of Transmission Licence) (1st Amendment) Regulations, 2021 07-07-2021
49 HERC (Terms and Conditions for determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation and Renewable Energy Certificate) Regulations, 2021 30-04-2021
50 HERC (Prepaid Smart Metering) Regulations, 2021, [Draft] 25-04-2021
Latest Documents
S. No. Title Date
1 HERC order (Petition by DHBVN in relation to electricity tariff for mushroom cultivation), 2024 06-09-2024
2 HERC order(Aggregate Revenue Requirements and distribution and retail supply tariff of UHBVNL and DHBVNL), 2024 02-09-2024
3 HERC Tariff Order for (UHBVNL and DHBVNL) True-up (FY 23), APR (FY 24), ARR & Tariff (FY 25) 05-03-2024
4 HERC Tariff Order for (HPGCL) True-up (FY 23), APR (FY 24), ARR & Tariff (FY 25) 20-02-2024
5 HERC (Petition for SEEKING RELAXATION/REMOVAL OF DIFFICULTY THERETO OF SUB-CLAUSE (2)(C) OF CLAUSE 4.4.3 OF THE HARYANA ELECTRICITY REGULATORY COMMISSION (ELECTRICITY SUPPLY CODE), REGULATIONS, 2014), 2023 06-12-2023
6 HERC Tariff order for TRUE-UP FOR THE FY 2021-22, ANNUAL (MID-YEAR) PERFORMANCE REVIEW FOR THE FY 2022-23, AGGREGATE REVENUE REQUIREMENT OF UHBVNL AND DHBVNL AND DISTRIBUTION & RETAIL SUPPLY TARIFF FOR THE FY 2023-24. 15-02-2023
7 HERC Tariff Order for (HVPNL) True-up (FY 22), APR (FY 23), ARR & Tariff (FY 24) 30-01-2023
8 HERC Tariff order for TRUE UP FOR FY 2021-22, ANNUAL (MID-YEAR) PERFORMANCE REVIEW OF FY 2022-23 AND DETERMINATION OF AGGREGATE REVENUE REQUIREMENT AND SLDC CHARGES FOR HARYANA VIDYUT PRASARAN NIGAM LIMITED (HVPNL) FOR THE FY 2023-24. 30-01-2023
9 HERC Tariff Order for (HPGCL) True-up (FY 22), APR (FY 23), ARR & Tariff (FY 24) 25-01-2023
10 HERC Tariff Order for (UHBVNL & DHBVNL) True-up (FY 21), APR (FY 22), ARR & Tariff (FY 23) 30-03-2022
11 HERC Tariff Order for (HVPNL) True-up (FY 21), APR (FY 22), ARR & Tariff (FY 23) 02-03-2022
12 HERC Tariff Order for (HPGCL) True-up (FY 21), MTR (FY 22), Tariff (FY 23) 22-02-2022
13 HERC Tariff Order for (HPGCL) True-up (FY 21), MTR (FY 22), ARR & Tariff (FY 23) 22-02-2022
14 HPERC Tariff Order for (HPSEBL-Gen) True-up (FY 12 to FY 14), ARR (FY 20 to FY 24) 11-11-2021
15 HPERC Tariff Order for (HPSLDC) True-up (FY 19 to FY 20), Provisional True-up (FY 21), MTR (FY 22 to FY 24) 12-08-2021
16 HERC Tariff Order for (UHBVNL & DHBVNL) True-up (FY 20), APR (FY 21), ARR & Tariff (FY 22) 30-03-2021
17 HERC Tariff Order for (HVPNL) True-up (FY 20), APR (FY 21), ARR & Tariff (FY 22) 09-03-2021
18 HERC Tariff Order for (HPGCL) True-up (FY 20), MTR (FY 21), ARR & Tariff (FY 22) 18-02-2021
19 HPERC Tariff Order for (HPSEBL) True-up (FY 18), APR (FY 20 to FY 24), ARR (FY 21) 06-06-2020
20 HERC Tariff Order for (UHBVNL & DHBVNL) True-up (FY 19), APR (FY 20), ARR (FY 21 to FY 25), Tariff (FY 21) 01-06-2020
21 HERC Tariff Order for (HVPNL) True-up (FY 19), APR (FY 20), ARR (FY 21 to FY 25), Tariff (FY 21) 21-05-2020
22 HERC Tariff Order for (HPGCL) True-up (FY 19), MTR (FY 20), ARR & Tariff (FY 21) 24-04-2020
23 HERC Tariff Order for (UHBVNL & DHBVNL) True-up (FY 18), APR (FY 19), ARR & Tariff (FY 20) 07-03-2019
24 HERC Tariff order for TRUE-UP FOR FY 2017-18, MID-YEAR PERFORMANCE REVIEW FOR FY 2018-19 AND DETERMINATION OF GENERATION TARIFF FOR THE FY 2019-20 07-03-2019
25 HERC Tarif order for TRUE UP OF THE AGGREGATE REVENUE REQUIREMENT (ARR) FOR TRANSMISSION BUSINESS AND STATE LOAD DISPATCH CENTRE (SLDC) FOR FY 2017-18, ANNUAL (MID-YEAR) PERFORMANCE REVIEW FOR FY 2018-19 AND DETERMINATION OF TRANSMISSION TARIFF AND SLDC CHARGES FOR THE FY 2019-20. 07-03-2019
26 HERC Tariff Order for (HPGCL) True-up (FY 18), MTR (FY 19), ARR & Tariff (FY 20) 25-02-2019
27 HERC Tariff Order for (UHBVNL & DHBVNL) True-up (FY 17), MTR (FY 18), ARR & Tariff (FY 19) 15-11-2018
28 HERC Tarif order of TRUE- UP FOR THE FY 2016-17, ANNUAL (MID-YEAR) PERFORMANCE REVIEW FOR THE FY 2017-18, AGGREGATE REVENUE REQUIREMENT OF UHBVNL AND DHBVNL AND DISTRIBUTION & RETAIL SUPPLY TARIFF FOR THE FY 2018-19 15-11-2018
29 HERC Tariff Order for (HPGCL) True-up (FY 17), MTR (FY 18), ARR & Tariff (FY 19) 31-10-2018
30 HERC Tariff Order for (HVPNL) True-up (FY 17), MTR (FY 18), ARR & Tariff (FY 19) 31-10-2018
31 HERC Tariff Order for (UHBVNL & DHBVNL) True-up (FY 16), MTR (FY 17), ARR & Tariff (FY 18) 11-07-2017
32 HERC Tariff Order for (HVPNL) True-up (FY 16), MTR (FY 17), ARR & Tariff (FY 18) 30-05-2017
33 HERC Tariff order for TRUE-UP PETITION FOR THE FY 2015-16, ANNUAL (MID-YEAR) PERFORMANCE REVIEW FOR THE FY 2016-17 AND TRANSMISSION TARIFF & SLDC CHARGES FOR THE FY 2017-18 30-05-2017
34 HERC Tariff Order for (HPGCL) True-up (FY 16), MTR (FY 17), ARR & Tariff (FY 18) 26-04-2017
35 HERC Tariff Order for (UHBVNL & DHBVNL) True-up (FY 15), MTR (FY 16), ARR & Tariff (FY 17) 01-08-2016
36 HERC Tariff Order for (HPGCL) True-up (FY 15), MTR (FY 16), ARR & Tariff (FY 17) 31-03-2016
37 HERC Tariff Order for (HVPNL) True-up (FY 15), MTR (FY 16), ARR & Tariff (FY 17) 31-03-2016
38 HERC Tariff Order for (UHBVNL & DHBVNL) True-up (FY 14), MTR (FY 15), ARR & Tariff (FY 16) 07-05-2015
39 HERC Tariff order for True - up petition for the FY 2013-14, Annual (Mid-year) Performance Review for the FY 2014-15 and Transmission Tariff & SLDC Charges for the FY 2015-16 31-03-2015
40 HERC Tariff Order for (HPGCL) True-up (FY 14), MTR (FY 15), ARR & Tariff (FY 16) 27-03-2015
41 HERC Tariff Order for (HPGCL) True-up (FY 13), ARR (FY 15 to FY 17), Tariff (FY 15) 29-05-2014
42 HERC Tariff Order for (HVPNL) ARR (FY 15 to FY 17), Tariff (FY 15) 29-05-2014
43 HERC Tariff Order for (UHBVNL & DHBVNL) ARR (FY 15 to FY 17), Tariff (FY 15) 29-05-2014
44 HERC Tariff Order for (UHBVNL & DHBVNL) ARR & Tariff (FY 14) 30-03-2013
45 HERC Tariff Order for (HPGCL) ARR & Tariff (FY 14) 29-03-2013
46 HERC Tariff Order for (HVPNL) ARR & Tariff (FY 14) 29-03-2013
47 HERC Tariff Order for (UHBVNL & DHBVNL) ARR & Tariff (FY 13) 31-03-2012
48 HERC Tariff Order for (HPGCL) ARR & Tariff (FY 13) 29-03-2012
49 HERC Tariff Order for (HVPNL) ARR & Tariff (FY 13) 29-03-2012
50 HERC Tariff Order for (UHBVNL & DHBVNL) ARR & Tariff (FY 12) 27-05-2011
Officers Contact
S.No. Name of Officer Name of Post Phone EPABX Ext. Email Address
1Sh. Nand Lal SharmaChairman2572997chairman[dot]herc[at]nic[dot]in
2Sh. Mukesh GargMember2562053member1[dot]herc[at]nic[dot]in
3Sh. Shiv KumarMember2572996member2[dot]herc[at]nic[dot]in
4Sh. Prashant Deshta, HPASCommission’s Secretary2582531206secretary[dot]herc[at]nic[dot]in
5Sh. Kuldeep SinghDirector (Technical), Additional Charge2582532405dir-tech[dot]herc[at]nic[dot]in
6Sh. Manish SinghalDirector (Tariff)2572395205dir-trf[dot]herc[at]nic[dot]in
7Ms. Jyoti VashistJoint Director (Accounts)2582532208jda[dot]herc[at]nic[dot]in
8Mrs. Alokka SharmaJoint Director (Law)2582532406jdl[dot]herc[at]nic[dot]in
9Sh. Manoj Kumar GargJoint Director (Distribution)2582532jdd[dot]herc-hry[at]gov[dot]in
10Sh. Kuldeep SinghJoint Director (Transmission)2582532
11Ms. Sonia SangwanDeputy Director (Economics)2582532404dde[dot]herc[at]nic[dot]in
12Sh. Amarjeet SinghLaw Officer2570677402lo2[dot]herc[at]hry[dot]gov[dot]in
13Sh. Pardeep Kumar MalikDeputy Director (Media)2572359106ddmedia[dot]herc[at]hry[dot]gov[dot]in
14Mrs. Ankita MahajanDeputy Director (Finance)2582532410ddf[dot]herc-hry[at]gov[dot]in
15Sh. Rishi ParwandaSystem Manager2582532210sm[dot]herc[at]nic[dot]in
16Sh. Ashish BansalDeputy Director (Accounts)2582532209dda[dot]herc[at]nic[dot]in
17Sh. Ramesh Datt Sharda (on deputation from UHBVN)Deputy Director (Distribution)2582532409dd1[dot]herc[at]nic[dot]in
18Dr. Varun Kumar (on deputation from DHBVN)Consultant2582532207
19Sh. Ashish VermaPrivate Secretary2582532304
Go to Top